2 floors · 1 apartments · 4,430 sq ft · built 1937 · class M9 · owner of record: Iglesia De Dios Pentecos
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-02-05 (Accepted). Agency page | Dec 31, 2026 in 62 days | 2 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 24, 2026 | Unknown CLASS - 1 OBSERVED PROPOSED 3 STORY NB AT FOUNDATION/ STRUCTURAL PHASE OF CELLAR & GF .I OBSERVED VERTICAL STEEL MEMBERS INSTALLED HIGHER THAN CONSTRUCTION FENCE HEIGHT 5FT AWAY FROM PRIVATE HOME WITH NO OVERHEAD PROTEC #39558261Y | Oct 30, 2026 PENDING | $10,000 |
| Aug 24, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, I OBSERVED PROPOSED 3 STORY NB AT FOUNDATION/ STRUCTURAL PHASE OF CELLAR & GF .I OBSERVED THE CONSTRUCTION FENCE NOT MAINTAINED AS PER CODE WITH: LEANING & DAMAGED FENCE PANELS AND VIEWI #39558258N | Oct 30, 2026 PENDING | $1,000 |
| Mar 18, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE NOT MAINTAIN IN CODE COMPLYING MANNER. AT EXP. 2 AND 3 OBSERVED SEVERAL BOARDS IN STATE OF DISREPAIR. SOME BOARDS ALREADY COLLAPSE AT EXP. 3 AT EXP. BOARD LEANI #39551991Y | May 29, 2026 DEFAULT | $10,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 24, 2026 | ECB | Unknown: OBSERVED PROPOSED 3 STORY NB AT FOUNDATION/ STRUCTURAL PHASE OF CELLAR & GF .I OBSERVED VERTICAL STEEL MEMBERS INSTALLED HIGHER THAN CONSTRUCTION FENCE HEIGHT 5FT AWAY FROM PRIVATE HOME WITH NO OVERHEAD PROTEC | Open |
| Aug 24, 2026 | ECB | Construction: AT TIME OF INSPECTION, I OBSERVED PROPOSED 3 STORY NB AT FOUNDATION/ STRUCTURAL PHASE OF CELLAR & GF .I OBSERVED THE CONSTRUCTION FENCE NOT MAINTAINED AS PER CODE WITH: LEANING & DAMAGED FENCE PANELS AND VIEWI | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 6:12 PM ET. BBL 2037680020.