2 floors · 2 apartments · 3,312 sq ft · built 1899 · class B9 · owner of record: Oke, Abiola
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Zoning CLASS - 3 VIOLATION FOR ZONING RESOLUTION-FRONT YARD PLANTING : AT TIME OF INSPECTION,OBSERVED PLANTING FROM THE ENTIRE FRONT YARD HAS BEEN REMOVED,AND REPLACED WITH CONCRETE ,THIS IS AN R 6 DISTRICT ,AND PLANTING IS REQ #39205132Y | Dec 2, 2026 PENDING | $500 |
| Sep 22, 2026 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER. NOTED : AT TIME OF INSPECTION,OBSERVED AT EXPOSURE 1 ,THE CURB WAS LOWERED APPROXIMATELY 13 FEET,CURB CUT IS MAINTAINED WITHOUT DOB APP #39205131M | Dec 2, 2026 PENDING | $500 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 3, 2026 | A | Apt 1 · § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1 LOWER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 7, 2026 |
| Sep 3, 2026 | B | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 8, 2026 |
| Sep 3, 2026 | B | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 8, 2026 |
| Sep 3, 2026 | B | Apt 1 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT APARTMENT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 1 UPPER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 8, 2026 |
| Sep 3, 2026 | A | Apt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET OBSERVED AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1 UPPER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 7, 2026 |
| Sep 3, 2026 | B | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL AND CEILING IN THE ENTRANCE LOCATED AT APT 1 LOWER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 8, 2026 |
| Sep 3, 2026 | B | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1 LOWER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 8, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | ECB | Zoning: VIOLATION FOR ZONING RESOLUTION-FRONT YARD PLANTING : AT TIME OF INSPECTION,OBSERVED PLANTING FROM THE ENTIRE FRONT YARD HAS BEEN REMOVED,AND REPLACED WITH CONCRETE ,THIS IS AN R 6 DISTRICT ,AND PLANTING IS REQ | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING AND PARTS THEREOF IN A CODE COMPLIANT MANNER. NOTED : AT TIME OF INSPECTION,OBSERVED AT EXPOSURE 1 ,THE CURB WAS LOWERED APPROXIMATELY 13 FEET,CURB CUT IS MAINTAINED WITHOUT DOB APP | Open |
| Sep 3, 2026 | HPD A | § 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1 LOWER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 3, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 3, 2026 | HPD B | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 3, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT APARTMENT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 1 UPPER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 3, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET OBSERVED AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1 UPPER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 3, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL AND CEILING IN THE ENTRANCE LOCATED AT APT 1 LOWER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Sep 3, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1 LOWER LEVEL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 12:56 PM ET. BBL 3012900035.