1 floors · 3,035 sq ft · built 1931 · class K1 · owner of record: 124-10 Liberty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 5, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER, PARAPET WALL LEANING FORWARD 15DEGREES, WALL IS UNSTABLE CAN FALL TO SIDEWALK., REPAIR AND/REPLACE #39199177J | May 11, 2027 | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Closed |
| Aug 5, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL@ EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY & HEAVILY CRCKD ROOF MEMBRANE REPEATEDLY TORN&PATCHED.SBMT ANNUAL PARAPET OBSVTN RPRT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 8/19/ 26 TO ANKMIOTEK@BUILDINGS.NY | Closed |
| Aug 5, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL@ EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/7/26.SGN OFF R | Closed |
| Aug 5, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL @EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE TO PRVDE WRITTEN MEANS&METHDS | Closed |
| Aug 5, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER, PARAPET WALL LEANING FORWARD 15DEGREES, WALL IS UNSTABLE CAN FALL TO SIDEWALK., REPAIR AND/REPLACE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 1:22 PM ET. BBL 4095780006.