Queens · Block 9578 · Lot 6 · 11419

124-10 Liberty Avenue

1 floors · 3,035 sq ft · built 1931 · class K1 · owner of record: 124-10 Liberty Llc

1open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
777dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 777 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
Aug 5, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER, PARAPET WALL LEANING FORWARD 15DEGREES, WALL IS UNSTABLE CAN FALL TO SIDEWALK., REPAIR AND/REPLACE
#39199177J
May 11, 2027
$2,500
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 9, 2026DOB SafetyAEUHAZ: Closed
Aug 5, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL@ EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY & HEAVILY CRCKD ROOF MEMBRANE REPEATEDLY TORN&PATCHED.SBMT ANNUAL PARAPET OBSVTN RPRT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 8/19/ 26 TO ANKMIOTEK@BUILDINGS.NYClosed
Aug 5, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL@ EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/7/26.SGN OFF RClosed
Aug 5, 2026DOBCONSTRUCTION: EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL @EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE TO PRVDE WRITTEN MEANS&METHDSClosed
Aug 5, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER, PARAPET WALL LEANING FORWARD 15DEGREES, WALL IS UNSTABLE CAN FALL TO SIDEWALK., REPAIR AND/REPLACEClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 1:22 PM ET. BBL 4095780006.

Look up another building