Manhattan · Block 1859 · Lot 7501 · 10025

123 West 104 Street

10 floors · 56 apartments · 64,105 sq ft · built 1990 · class RM · owner of record: West 104th Street Associates, L.P.

53open violations
$0ECB/OATH penalties owed
5HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 45 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 45 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 61 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $33,750 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 97 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 64,105 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 166 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 166 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1141 days
Next cycle year 2029
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1859). Agency page

Dec 31, 2029
in 1141 days
Next due 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-28 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
May 6, 2026Elevators CLASS - 2
VF..COMMUNICATION INOPERATIVE REPAIR , C O P CAMERA INOPERATIVE REPAIR ... 211.1.3.11.1...
#39187365Z
Jul 16, 2026
DEFAULT
$0
Sep 30, 2022Elevators CLASS - 2
2/X/10 OUT SIDE COMM INOPERATIVE REPAIR,59/BB/7 MACHINE BRAKE TAG EXPIRED PROVIDE. PIT DIRTY CLEAN,
#39071201H
Nov 17, 2022
ADMIT/IN-VIO
$0
Jul 30, 2021Elevators CLASS - 2
FOUND PHONE IN CAR IS NOT WORKING. REPAIR. CALL CALL BUTTONS IN CAR STATION MARKED 4 & 5 ARE DAMAGED. REPLACE. LABEL OF FUSES IN THE ELEVATOR CONTROLLER AT ELEVATOR MACHINE ROOM ARE UNREADABLE. REPLACE. ELEVATO
#39045309K
Dec 16, 2021
DEFAULT
$0
DOB (5)
IssuedViolationStatus
Jun 25, 2019ELEVATOR
CEASE USE
#9028H657149
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#02381
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#02382
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#06005
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#06006
DOB VIOLATION - ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Jan 1, 2009Boiler LL6291
Active
Jan 1, 2009Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 18, 1993Boiler LL6291
Active
HPD (36) · C 5 · B 19 · A 12
IssuedClassViolationCorrect by
Sep 14, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING SOUTH TO FRONT AREAWAY AT CELLARSep 28, 2026
Sep 11, 2026A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTICAL DROP CEILING INSTALLED AT PUBLIC HALL, 10th STORYDec 15, 2026
Sep 11, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMADec 15, 2026
Jun 12, 2026A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC CEILING AT PUBLIC HALL, 10th STORYSep 15, 2026
May 7, 2026AApt 5D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL/BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE TO THE PANEL AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHAug 10, 2026
May 4, 2026BApt 5D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 8, 2026
May 4, 2026AApt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHAug 7, 2026
Dec 18, 2025B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR , 1st STORYJan 22, 2026
Sep 25, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT VESTIBULE DOOR , 1st STORYOct 9, 2025
Sep 4, 2025A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CELING AT PUBLIC HALL, 10th STORYDec 8, 2025
Sep 2, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES. AT PUBLIC HALL, 10th STORYOct 7, 2025
Jun 10, 2025AApt 8E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHSep 13, 2025
Jun 10, 2025A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AT PUBLIC HALL, 2nd STORYSep 13, 2025
Jun 10, 2025AApt 8E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH COUNTER BALANCE AT THE 1ST WINDOW FROM EAST AT SOUTH IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHSep 13, 2025
Jun 10, 2025AApt 8E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHSep 13, 2025
Apr 24, 2025CApt 8E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 20, 2025
Aug 10, 2023BApt 8E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LOWER WOOD BASE CABINETS AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHSep 14, 2023
Mar 31, 2023CApt 8E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 26, 2023
Mar 31, 2023CApt 8E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHApr 26, 2023
Mar 31, 2023BApt 8E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 5, 2023
Mar 31, 2023BApt 8E · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOORKNOB IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 5, 2023
Mar 31, 2023BApt 8E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR TO BASE CABINET AT SOUTH IN THE KITCHEN LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 5, 2023
Mar 31, 2023BApt 8E · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR AT ENTRANCE IN THE 2nd ROOM FROM NORTH LOCATED AT APT 8E, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 5, 2023
Aug 20, 2018BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 3rd APARTMENT FROM WEST AT NORTHSep 24, 2018
Aug 20, 2018BApt 7D · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT ENTRANCE LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM EAST AT SOUTHSep 24, 2018
Apr 14, 2017BApt 7D · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM EAST AT SOUTHMay 19, 2017
Apr 14, 2017BApt 7D · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM EAST AT SOUTHMay 19, 2017
Feb 17, 2017AApt 7D · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CREAMIC TILE WALLS AT SHOWER IN THE BATHROOM LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM EAST AT SOUTHMay 23, 2017
Aug 27, 2014BApt 8B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE VENTILATION SYSTEM WEST WALL IN THE KITCHEN LOCATED AT APT 8B, 8th STORY, 4th APARTMENT FROM WEST AT NORTHOct 1, 2014
Aug 27, 2014BApt 8B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 8B, 8th STORY, 4th APARTMENT FROM WEST AT NORTHOct 1, 2014
Aug 27, 2014AApt 8B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROOM LOCATED AT APT 8B, 8th STORY, 4th APARTMENT FROM WEST AT NORTHNov 30, 2014
Aug 27, 2014BApt 8B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 8B, 8th STORY, 4th APARTMENT FROM WEST AT NORTHOct 1, 2014
Aug 27, 2014BApt 8B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES WEST WALL IN THE BATHROOM LOCATED AT APT 8B, 8th STORY, 4th APARTMENT FROM WEST AT NORTHOct 1, 2014
Jul 20, 2011BApt 5D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHAug 24, 2011
Dec 6, 2010BApt 7A · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 7A, 7th STORY, 3rd APARTMENT FROM WEST AT NORTHJan 10, 2011
Nov 10, 2005BApt 8H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALL IN THE BATHROOM LOCATED AT APT 8H, 8th STORY, 2nd APARTMENT FROM WEST AT NORTHDec 20, 2005

Issued in the last 120 days

DateSourceWhatNow
Sep 14, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING SOUTH TO FRONT AREAWAY AT CELLAROpen
Sep 11, 2026HPD A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTICAL DROP CEILING INSTALLED AT PUBLIC HALL, 10th STORYOpen
Sep 11, 2026HPD A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAOpen
Aug 27, 2026ECBElevators: VF.. MAINTENANCE LOG NOT UPDATE PROVIDE..8.6T.1.4..COMMUNICATION DEFECTIVE REPAIR... CAMERA INOPERATIVE REPAIR .. 8.6.4.15..Closed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 16, 2026, 10:18 PM ET. BBL 1018597501.

Look up another building