4 floors · 6 apartments · 7,434 sq ft · built 1910 · class S5 · owner of record: West 27 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-26 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #01775 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08041 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30294 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #04261 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #04262 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #01428 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 30, 2026 | B | Apt 2N · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 4, 2026 |
| Oct 30, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 2nd STORY | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt 2N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt 2N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 4, 2026 |
| Oct 30, 2026 | B | Apt 2N · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 4, 2026 |
| Jun 11, 2026 | B | Apt 2N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 16, 2026 |
| Jun 8, 2026 | A | Apt 5 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ELECTRIC RANGE ILLEGALLY INSTALLED IN THE KITCHEN LOCATED AT APT 5, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 11, 2026 |
| Dec 10, 2024 | B | Apt 2N · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT DOOR LEADING TO FIRE ESCAPE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 14, 2025 |
| Dec 10, 2024 | B | Apt 2N · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 14, 2025 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | A | Apt 2N · § 27-2005 HMC: REFIT THE CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 27, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WALL CABINETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER WINDOW SASHES IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER WINDOW SASHES IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | A | Apt 2N · § 27-2005 HMC: REFIT THE ENTRANCE DOOR IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 27, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER SASHES AT 1ST WINDOW FROM WEST IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | A | Apt 2N · § 27-2005 HMC: REFIT THE ENTRANCE DOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 27, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND COUNTERTOP IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Jun 24, 2024 | B | Apt 2N · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jul 29, 2024 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH COUNTER BALANCES AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BALANCES AT UPPER AND LOWER WINDOW SASHES AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE FOYER LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH BALANCES AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Mar 7, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER AND LOWER WINDOW SASH BALANCES AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2023 |
| Sep 1, 2015 | B | Apt 5 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 5, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 6, 2015 |
| Aug 14, 2015 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC-TILES FLOOR AT PUBLIC HALL, 2nd STORY | Sep 18, 2015 |
| Aug 14, 2015 | B | Apt 5 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 5, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 18, 2015 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 30, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 30, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 2nd STORY | Open |
| Oct 30, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 30, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 30, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 3:08 PM ET. BBL 1002060017.