Queens · Block 9560 · Lot 30 · 11419

123-15 Liberty Avenue

2 floors · 2 apartments · 2,920 sq ft · built 1920 · class S2 · owner of record: Persaud, Oudit S

6open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-05 (Accepted). Agency page

Dec 31, 2026
in 44 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 775 days
Next cycle year 2028

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Aug 8, 2016Construction CLASS - 1
B101 WORK W/O PERMIT. WEIL MCLAIN EG45 150,000. BOILER NOT RUNNING FOR SUMMER. NO ACCESS TO CHECK CHIMNEY VENTING INTO SAME CHIMNEY AS BOTH WATER HEATER AS PER MANUFACTURER CANNOT.
#32076708P
Sep 27, 2016
IN VIOLATION
$0
Aug 8, 2016Boilers CLASS - 1
B154,4A,15,16,24B,36,38,50A,50B. 50A-NEED 2 LOWER WATER CUT OFFS 1 MANUAL RESET; 50B-NO FRESH AIR TO BOILER ROOM; 50C-REMOVE SWITCH REQUIREAT ENTRANCE TO BOILER ROOM; 50A-CANNOT VENT BOCH WATER HEATER INTO SAM
#32076709R
Sep 27, 2016
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Nov 2, 2016FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00458
DOB VIOLATION - ACTIVE
Nov 2, 2016FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00457
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Nov 2, 2016AEUHAZ FTC-AEU-HAZ
Active
Nov 2, 2016AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 9:41 PM ET. BBL 4095600030.

Look up another building