2 floors · 2 apartments · 3,324 sq ft · built 1901 · class B2 · owner of record: Bushwick Barn Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 25, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED STRUCTURAL WORK STEAL BEAM IN PLACE AT CELLAR LEVEL SUPPORTING FIRST FLOOR. STAIRS ARE INSTALLED ON THE 2ND FLOOR LEADING TO ROOF WITH ADDED BULK. STAIRS REMOVED AT EXP#1. UPON RE #39558377X | Nov 4, 2026 PENDING | $2,500 |
| Aug 25, 2026 | Unknown CLASS - 1 BC 1704.1.1 (MISC. & 27-132 ) AT TIME OF INSPECTION OBSERVED STRUCTURAL WORK STEEL BEAM IN PLACE AT CELLAR LEVEL SUPPORTING FIRST FLOOR. NO TR1 FOR STRUCTURAL STEEL BEAM AND NO WOOD JOINTS. UPON REVIEWING DOB #39558364R | Nov 4, 2026 PENDING | $5,000 |
| Aug 25, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION ACTIVE SITE OBSERVED LARGE PILE OF DEBRIS ACCUMULATION AT FRONT YARD EXP# 1, BRACING THE FENCE POSED A RISK OF COLLAPSING. STOP ALL WORK ENTIRE . #39558365Z | Nov 4, 2026 PENDING | $1,250 |
| Aug 25, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED NO HANDRAIL INSTALLED AT STAIRS CASE AT 1ST FLOOR TO 2ND FLOOR LEVEL. STOP ALL USE OF STAIRCASE. #39558368Y | Nov 4, 2026 PENDING | $2,500 |
| Aug 25, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION ACTIVE SITE WORK IN PROGRESS UPON REQUESTING DOCUMENTS - SITE SAFETY PLANS APPROVED PLANS NONE WERE PROVIDED. STOP ALL WORK ENTIRE SITE. #39558366K | Nov 4, 2026 PENDING | $1,250 |
| Aug 25, 2026 | Plumbing CLASS - 2 AT TIME OF INSPECTION OBSERVED ROUGH-IN OF PLUMBING. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS NO PLUMBING PERMIT FOUND/ OBTAINED IN ADDITION UPON REQUESTING NONE PROVIDED. STOP ALL PLUMBING ENTIRE SITE. #39558376Y | Nov 4, 2026 PENDING | $2,500 |
| Aug 25, 2026 | Site Safety CLASS - 1 AT TIME OF INSPECTION GC FAILED TO DESIGNATE CONSTRUCTION SUPERINTENDENT OBSERVED MORE THAN 50% OF THE GROSS FLOOR AREA ALTERED + REMOVED AND REPLACED JOINTS. STOP ALL WORK ENTIRE SITE DESIGNATE CONSTRUCTION S #39558378H | Nov 4, 2026 PENDING | $10,000 |
| Aug 25, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED UNSECURED SITE OPEN PERIMETER WALLS AND LARGE PILES OF DEBRIS WITH NO 8FT CONSTRUCTION FENCE. THIS CREATES UNAUTHORIZED ACCESS FOR PUBLIC TO ENTER SITES. STOP ALL WORK ENTIRE SITE #39558367M | Nov 4, 2026 PENDING | $1,000 |
| Aug 25, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION OBSERVED ROUGH-IN OF ELECTRICAL. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS NO ELECTRICAL PERMIT FOUND OR OBTAINED IN ADDITION UPON REQUESTING NONE PROVIDED. STOP ALL ELECTRICAL WORK EN #39558369X | Nov 4, 2026 PENDING | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 25, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED STRUCTURAL WORK STEAL BEAM IN PLACE AT CELLAR LEVEL SUPPORTING FIRST FLOOR. STAIRS ARE INSTALLED ON THE 2ND FLOOR LEADING TO ROOF WITH ADDED BULK. STAIRS REMOVED AT EXP#1. UPON RE | Open |
| Aug 25, 2026 | ECB | Unknown: BC 1704.1.1 (MISC. & 27-132 ) AT TIME OF INSPECTION OBSERVED STRUCTURAL WORK STEEL BEAM IN PLACE AT CELLAR LEVEL SUPPORTING FIRST FLOOR. NO TR1 FOR STRUCTURAL STEEL BEAM AND NO WOOD JOINTS. UPON REVIEWING DOB | Open |
| Aug 25, 2026 | ECB | Construction: AT TIME OF INSPECTION ACTIVE SITE OBSERVED LARGE PILE OF DEBRIS ACCUMULATION AT FRONT YARD EXP# 1, BRACING THE FENCE POSED A RISK OF COLLAPSING. STOP ALL WORK ENTIRE . | Open |
| Aug 25, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED NO HANDRAIL INSTALLED AT STAIRS CASE AT 1ST FLOOR TO 2ND FLOOR LEVEL. STOP ALL USE OF STAIRCASE. | Open |
| Aug 25, 2026 | ECB | Construction: AT TIME OF INSPECTION ACTIVE SITE WORK IN PROGRESS UPON REQUESTING DOCUMENTS - SITE SAFETY PLANS APPROVED PLANS NONE WERE PROVIDED. STOP ALL WORK ENTIRE SITE. | Open |
| Aug 25, 2026 | ECB | Plumbing: AT TIME OF INSPECTION OBSERVED ROUGH-IN OF PLUMBING. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS NO PLUMBING PERMIT FOUND/ OBTAINED IN ADDITION UPON REQUESTING NONE PROVIDED. STOP ALL PLUMBING ENTIRE SITE. | Open |
| Aug 25, 2026 | ECB | Site Safety: AT TIME OF INSPECTION GC FAILED TO DESIGNATE CONSTRUCTION SUPERINTENDENT OBSERVED MORE THAN 50% OF THE GROSS FLOOR AREA ALTERED + REMOVED AND REPLACED JOINTS. STOP ALL WORK ENTIRE SITE DESIGNATE CONSTRUCTION S | Open |
| Aug 25, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED UNSECURED SITE OPEN PERIMETER WALLS AND LARGE PILES OF DEBRIS WITH NO 8FT CONSTRUCTION FENCE. THIS CREATES UNAUTHORIZED ACCESS FOR PUBLIC TO ENTER SITES. STOP ALL WORK ENTIRE SITE | Open |
| Aug 25, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED ROUGH-IN OF ELECTRICAL. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS NO ELECTRICAL PERMIT FOUND OR OBTAINED IN ADDITION UPON REQUESTING NONE PROVIDED. STOP ALL ELECTRICAL WORK EN | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 8:22 PM ET. BBL 3032960044.