Queens · Block 16138 · Lot 11 · 11693

122 Beach 93 Street

2 floors · 4 apartments · 2,164 sq ft · built 1920 · class C3 · owner of record: 122 Beach 93 St Corp

9open violations
$6,250ECB/OATH penalties owed
1HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 428 days
Next cycle year 2027

Open violations

ECB / OATH (5) · $6,250 owed
IssuedViolationHearingBalance
Aug 21, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT CHIMNEY, OBSERVED CHIMNEY HEIGHT HAS BEEN REDUCED AND LONGER STANDS 3FT FROM ROOF, AS PER 27-859., REPAIR AND/OR REPLACE
#39158020K
Dec 8, 2026
DEFAULT
$6,250
Apr 17, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT CHIMNEY. CHIMNEY APPEARS TO BE IN DANGEROUS CONDITION, WITH MISSING MORTARJOINTS AT EXPOSED BRICK FACADE. CHIMNEY IS LEANING OUT OF PLUMB CAUSIN
#39145215H
Jun 24, 2025
STIPULATION/IN-VIO
$0
Apr 16, 2025Construction CLASS - 3
WORK WITHOUT A PERMIT. NOTED AT CELLAR LEVEL. OBSERVED WOOD FRAMING HAS BEEN INSTALLED FOR 3PC BATHROOM., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
#39145095M
Jun 24, 2025
STIPULATION/IN-VIO
$0
Apr 16, 2025Construction CLASS - 3
WORK WITHOUT A PERMIT. NOTED AT CELLAR LEVEL. INSTALLED ELECTRICAL WIRING FOR 3PC BATHROOM AND FOR 240V OUTLET., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
#39145093Z
Jun 24, 2025
STIPULATION/IN-VIO
$0
Apr 16, 2025Construction CLASS - 2
WORK WITHOUT A PERMIT. NOTED AT CELLAR LEVEL. INSTALLED WATER AND WASTE LINES FOR WASHING MACHINE SETUP AND 3PC BATHROOM (SHOWER, SINK, TOILET)., OBTAIN ALL PERMITS
#39145094K
Jun 24, 2025
STIPULATION/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 14)
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 14)
Active
HPD (2) · C 1 · B 1 · A 0
IssuedClassViolationCorrect by
Oct 13, 2023CApt BSMT · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT BSMT, 1st APARTMENT FROM SOUTH AT WESTOct 19, 2023
Sep 8, 2009BApt HOUSE · SECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES KITCHEN AND BATHROOM IN THE ENTIRE APARTMENT LOCATED AT APT HOUSE, 1st STORYOct 13, 2009

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 11:05 AM ET. BBL 4161380011.

Look up another building