Queens · Block 11679 · Lot 9 · 11420

122-79 Rockaway Boulevard

2 floors · 8,428 sq ft · built 1934 · class K2 · owner of record: Ali, Jameel

3open violations
$8,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
789dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 789 days
Next cycle year 2028

Open violations

ECB / OATH (2) · $8,000 owed
IssuedViolationHearingBalance
Sep 8, 2016Construction CLASS - 1
FAILURE TO PROVIDE REQUIRED TENANT PROTECTION PLAN WHEN PERFORMING CONSTRUCTION WORK IN A BLDG WITH AN OCCUPIED DWELLING UNIT. AT THE TIME OF INSPECTION IT WAS OBSERVED CONSTRUCTION WORK HAD STARTED & THERE WAS
#35156326Z
Oct 25, 2016
DEFAULT
$8,000
Jun 17, 2009Construction CLASS - 3
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS JOB #410121167/A2/05-28-2009 NOTED AT ROOF EXISTING DUNNAGE 4"HIGH SETTEL ON PARAPET WALL AND CEMENT BLOCK PLAN SHOWS NEW STEE
#34774309Z
Aug 3, 2010
DEFAULT
$0
DOB (1)
IssuedViolationStatus
Aug 16, 2019ELEVATOR

#9027/660571
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 6:06 PM ET. BBL 4116790009.

Look up another building