1 floors · 7,910 sq ft · built 1962 · class K4 · owner of record: Northern 167 Property Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 55 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-05-12 (Accepted). Agency page | Dec 31, 2026 in 55 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1151 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 7, 2026 | Unknown CLASS - 1 BC 3301.2 6-STORY, 99-UNIT BUILDING, AN ACTIVE JOB SITE WAS OBSERVED. MULTIPLE EXPOSED REBARS WITHOUT REQUIRED PROTECTIVE CAPS WERE OBSERVED, CREATING AN IMPALEMENT HAZARD TO WORKERS AND OTHER PERSONS. PROVIDE #39558850M | Nov 17, 2026 | $5,000 |
| Sep 7, 2026 | Construction CLASS - 1 AT INSPECTION OF A 6-STORY BUILDING, CURRENTLY AT THE FIRST-FLOOR LEVEL, REQUIRED GUARDRAILS WERE MISSING AT THE STAIRWAY AND ELEVATOR SHAFT OPENINGS LEADING TO THE BASEMENT. THIS CONDITION CREATES A FALL HAZAR #39558849P | Nov 17, 2026 | $5,000 |
| Sep 7, 2026 | Construction CLASS - 2 BC 3301.1.3 YODOCK BARRIERS WERE OBSERVED IN PLACE WITHOUT REQUIRED INTERLOCK AND WERE NOT FILLED WITH WATER/ SEND. THIS CONDITION CREATES A HAZARD AND POTENTIAL FOR MOVEMENT INTO THE ROADWAY, CONTRARY TO MANU #39558851Y | Nov 17, 2026 | $1,250 |
| Sep 7, 2026 | Construction CLASS - 2 AT INSPECTION OF A 6-STORY, 99-UNIT BUILDING, AN ACTIVE JOB SITE WAS OBSERVED. PILES OF DEBRIS WAS OBSERVED AT THE BASEMENT LEVEL, CREATING POTENTIAL FIRE AND TRIPPING HAZARDS TO WORKERS, THE PUBLIC, AND PROPE #39558848N | Nov 17, 2026 | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #17366 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #15946 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #39323 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20834 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #22605 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 7, 2026 | ECB | Unknown: BC 3301.2 6-STORY, 99-UNIT BUILDING, AN ACTIVE JOB SITE WAS OBSERVED. MULTIPLE EXPOSED REBARS WITHOUT REQUIRED PROTECTIVE CAPS WERE OBSERVED, CREATING AN IMPALEMENT HAZARD TO WORKERS AND OTHER PERSONS. PROVIDE | Closed |
| Sep 7, 2026 | ECB | Construction: AT INSPECTION OF A 6-STORY BUILDING, CURRENTLY AT THE FIRST-FLOOR LEVEL, REQUIRED GUARDRAILS WERE MISSING AT THE STAIRWAY AND ELEVATOR SHAFT OPENINGS LEADING TO THE BASEMENT. THIS CONDITION CREATES A FALL HAZAR | Closed |
| Sep 7, 2026 | ECB | Construction: BC 3301.1.3 YODOCK BARRIERS WERE OBSERVED IN PLACE WITHOUT REQUIRED INTERLOCK AND WERE NOT FILLED WITH WATER/ SEND. THIS CONDITION CREATES A HAZARD AND POTENTIAL FOR MOVEMENT INTO THE ROADWAY, CONTRARY TO MANU | Closed |
| Sep 7, 2026 | ECB | Construction: AT INSPECTION OF A 6-STORY, 99-UNIT BUILDING, AN ACTIVE JOB SITE WAS OBSERVED. PILES OF DEBRIS WAS OBSERVED AT THE BASEMENT LEVEL, CREATING POTENTIAL FIRE AND TRIPPING HAZARDS TO WORKERS, THE PUBLIC, AND PROPE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 6, 2026, 5:33 PM ET. BBL 4039970001.