4 floors · 10 apartments · 7,887 sq ft · built 2019 · class C1 · owner of record: 1214 Greene Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 56 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 6, 2020 | Construction CLASS - 2 FAILURE TO PERMIT HODLER TO PROVIDE INSPECTION ACCESS TO AND/OR EXPOSE ONGOING CONSTRUCTION OR WORK ON AN ACTIVE AND PERITTED WORKSITE AS NOTED AT THE TIME OF MY INSPECTION ON 4 STORIES OBSERVED #35538511Y | Mar 17, 2021 IN VIOLATION | $1,250 |
| May 5, 2020 | Construction CLASS - 1 SEC. 3303.7.2 FIRE EXTINGUISHERS SHALL BE PROVIDED IN ACCORDANCE W/NYC FIRE CODE. NOTED: AT THE TIME OF MY INSPECTION OF 4 STY NEW BLDG ACTIVE CONSTRUCTION SITE I OBSERVED MISSING FIRE EXTINGUISHERS ON ROOF LEV #35489970P | Sep 9, 2020 IN VIOLATION | $2,500 |
| May 5, 2020 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO HANDRAILS. NOTED: AT THE TIME OF MY INSPECTION OF 4 STY ACTIVE NEW BLDG CONSTRUCTION SITE,I OBSERVED MISSING(NOT INSTALLED) #35489968X | Sep 9, 2020 IN VIOLATION | $2,500 |
| May 5, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. NOTED: AT THE TIME OF MY INSPECTION OF 4 STY NEW BLDGACTIVE CONSTRUCTION SITE I OBSERVED INADEQUATE HOUSEKEEPING OF EVERY FLOOR & STAIRWAYS. #35489969H | Sep 9, 2020 IN VIOLATION | $625 |
| Mar 4, 2020 | Unknown CLASS - 1 PERMIT HOLDER FAILED TO ENSURE ALL WORKERS RECEIVE SITE SAFETY CORIENTATION.NOTE:AT THE TIME OF MY INSPECTION OF AN ACTIVE JOB SITE CONSTRUCTION WORK IN PROGRESS,UPON REQUEST FOR THE SITE SAFETY ORIENTAION FOR #35480628Z | Nov 9, 2020 IN VIOLATION | $5,000 |
| Mar 4, 2020 | Construction CLASS - 2 FAILURE TO INSTITUTE & MAINTAIN TEMPORARY EQUIPMENT MEASURES & TEMPORARY CONSTRUCTIOIN-OVERHEAD PROTECTION NOTE: @THE TIME OF INSPECTION OF AN ACTIVE JOBSITE, I OBSERVED CONSTRUCTION WORK OF PARAPET COPPING IN #35480629K | Nov 9, 2020 IN VIOLATION | $5,000 |
| Oct 2, 2019 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED PUMP JACK SCAFFOLD INSTALLED AT EXP#4 AND 2 CONSTRUCTION WORKERS USING IT #35453386L | Jul 12, 2021 IN VIOLATION | $625 |
| Oct 2, 2019 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED ERECTED SUPPORTED SCAFFOLD APPROX 50' IN HEIGHT AT EXP#1. SCAFFOLD IS PAR #35453388P | Nov 4, 2021 IN VIOLATION | $2,500 |
| Oct 2, 2019 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED DIAGONAL STEEL MEMBERS WELDED/CONNECTED W/ STRUCTURAL STEEL COLUMNS CONTR #35453387N | Jul 12, 2021 IN VIOLATION | $2,500 |
| Oct 2, 2019 | Unknown CLASS - 2 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES AS PER CODE(INADEQUATE DAILY LOG BOOK). AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED THAT SUPERINTENDENT WAS NOT ON SITE AND THE FOLLOWING CONDITIONS #35453389R | Jun 3, 2021 IN VIOLATION | $2,500 |
| May 22, 2019 | Construction CLASS - 1 SEC. 3309.10 ROOF PROTECTION MISSING. AT THE TIME OF INSPECTION OF A NEW 4 STY BLDG UNDER CONSTRUCTION I OBSERVED NO ROOF PROTECTION AT EXP#2 OF THE ADJACENT BLDG. THE CONSTRUCTION SITE IS ABOVE THE ROORF LEVEL #35421230Z | Apr 19, 2021 IN VIOLATION | $2,500 |
| May 22, 2019 | Construction CLASS - 2 FAILURE TO PROVIDE OVERHEAD PROTECTION. AT THE TIME OF INSPECTION OF A4 STY NEW BLDG UNDER CONSTRUCTION I OBSERVED NO OVERHEAD PROTECTION FOR THE NEIGHBORING PROPERTY AT EXP#4. THERE IS A DOORWAY & STEPS & THER #35421229L | Jul 2, 2021 IN VIOLATION | $5,000 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 25, 2026 | B | Apt 4B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 30, 2026 |
| Sep 25, 2026 | B | Apt 4B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 30, 2026 |
| Sep 25, 2026 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 30, 2026 |
| Sep 25, 2026 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 30, 2026 |
| Sep 25, 2026 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 21, 2026 |
| Aug 20, 2026 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2026 |
| Aug 20, 2026 | C | Apt 4B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 26, 2026 |
| Aug 20, 2026 | A | Apt 4B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 23, 2026 |
| Aug 20, 2026 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 15, 2026 |
| Aug 20, 2026 | B | Apt 4B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2026 |
| Aug 20, 2026 | B | Apt 4B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2026 |
| Aug 20, 2026 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2026 |
| Aug 20, 2026 | B | Apt 4B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2026 |
| Aug 20, 2026 | B | Apt 4B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 24, 2026 |
| Aug 22, 2025 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING , 1st STORY | Aug 28, 2025 |
| Jun 6, 2025 | A | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE HOUSEHOLD TRASH AT BUILDING FRONT YARD | Sep 9, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 25, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 25, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 25, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 25, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 20, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Aug 13, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER ABOVE 130 DEGREES AT FIXTURE IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 10:28 PM ET. BBL 3032960041.