9 floors · 38 apartments · 30,674 sq ft · built 2025 · class D6 · owner of record: 1211 Fulton St Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 30,674 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 833 days | Filing window not open yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 19, 2026 | Unknown CLASS - 1 B.C 3301.13.5 OBSERVED AN ACTIVE SITE COMPETENT PERSON ON SITE. UPON CHECKING CONSTRUCTION SUPER LOG BOOKS, SUPER FAILED TO REPORT TO THE SITE TO PERFORM HIS DUTIES ON MULTIPLE DAYS AND SIGN THE BOOK B.C 3301.1 #39549284M | Feb 9, 2027 | $5,000 |
| Dec 2, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED WORK AT THE BULKHEAD COMPLETED WHILE UNDER STOP WORK ORDER. GC FAIL TO COMPLY WITH THE COMMISSIONER'S ORDER AND WORKED AGAINST STOP WORK ORDER ISSUED 09/25/25 UNDER COMPLAINT# 3A3 #39547531L | Dec 8, 2026 | $10,000 |
| Nov 5, 2025 | Unknown CLASS - 1 ELEVATOR NOT AT READINESS AT THE TIME OF INSPECTION ON A ACTIVE JOB SITE OF A 9 STORY BUILDING CURRENTLY AT ROOF LEVEL , I OBSERVED THAT ELEVATOR WAS NOT AT READINESS AS PER BC 3003.3 CREATING A POTENTIAL HAZ #39546677J | Apr 12, 2027 | $5,000 |
| Sep 25, 2025 | Construction CLASS - 1 AT TIME OF INSPECTING OBSERVED ACCESS TO THE BULKHEAD,OBSERVED APPROXIMATELY 16 INCHES OF MASONRY BRICK INSTALLED AT THE PERIMETER OF THE BULKHEAD WITH A FALL OF APPROXIMATELY 8FT NO TEMPORARY GUARDRAIL IN PLAC #39545355M | Mar 16, 2027 | $5,000 |
| Aug 24, 2025 | Construction CLASS - 1 I OBSERVED AN ACTIVE WORK SITE. WORKERS ON ALL FLOORS. NO ACTIVE AFTER HOUR VARIANCE PERMIT ACTIVE. VIOLATING SECTION OF LAW 28-105.1 . STOP ALL WORK IMMEDIATELY #39544033P | Jan 25, 2027 | $2,500 |
| Aug 24, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION, I ASKED FOR ALL LOGS. COMPETENT PERSON WAS NOT ABLE TO SHOW ME CONCRETE STRAP SAFETY DAILY LOGS WHICH IS IN VIOLATION OF BC 3301.7 #39544035Z | Jan 25, 2027 | $1,250 |
| Aug 24, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION,I OBSERVED AN ACTIVE SITE WITH APPROXIMATELY 24 WORKERS. THERE WAS NO ACTIVE AFTER HOURS VARIANCE PERMIT ACTIVE TO PERFORM WORK VIOLATING PROVISION OF LAW 28-105.1STOP ALL AFTER HOURS WORK #39544059N | Jan 25, 2027 | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Aug 10, 2023 | IMMEDIATE EMERGENCY FULLY DEMOLISH THE BUILDING,GRADE AND FENCE SITE. COORDINATE WITH IED FOR DEMOLITION AT 1209, 1211, 1213,& 1213 REAR FULTON STREET BUILDINGS #17803 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #24971 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Closed |