11 floors · 49,815 sq ft · built 1924 · class O7 · owner of record: Professional Offices Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $225,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 96 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 49,815 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 17, 2024 | Construction CLASS - 2 A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MOR #37028894N | Jan 29, 2026 IN VIOLATION | $0 |
| Feb 28, 2023 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE #37025346Z | Dec 21, 2023 IN VIOLATION | $0 |
| Nov 1, 2021 | Construction CLASS - 2 27-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE O #37022503J | Jul 14, 2022 IN VIOLATION | $0 |
| Apr 1, 2021 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#805002. AGG1 PRIOR NOV 37011458X UNDER 28 #37021172J | Sep 23, 2021 ADMIT/IN-VIO | $0 |
| Jul 13, 2020 | Construction CLASS - 2 PROVISION OF LAW:27-929.1.A.C.27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19 IN A #37019905P | Jul 22, 2021 IN VIOLATION | $0 |
| Nov 15, 2019 | Construction CLASS - 2 A.C 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/2019,IN AN OFFICE BLDG 100 FT OR #37016682N | Feb 27, 2020 STIPULATION/IN-VIO | $0 |
| Sep 24, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND ROOF. SKYLITE APPURTENANCES DEFECTIVE CLOSURE. ROOF STORE ROOM WINDOW GLASS AND FRAME DEFECTIVE ORIGINAL WINDOWS NEAR/IN STAIRWELL DOUBLE HUNG WINDOW FRAMES RUST #35344904J | Jan 24, 2019 IN VIOLATION | $0 |
| May 18, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 228-302.4 FOR CONTROL#805002. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT #37011458X | Jan 17, 2019 IN VIOLATION | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT #36012320L | Nov 4, 2010 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 2, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00116 | DOB VIOLATION - ACTIVE |
| Sep 3, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00648 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01220 | DOB VIOLATION - ACTIVE |
| Mar 31, 2008 | EMERGENCY POWER #NRF00923 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 2, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Sep 3, 2019 | Sprinklers FTF-SP-FINAL | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Mar 31, 2008 | Emergency Power FTF-EL-ENRF | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 10:11 AM ET. BBL 1013950010.