Manhattan · Block 1395 · Lot 10 · 10022

121 East 60 Street

11 floors · 49,815 sq ft · built 1924 · class O7 · owner of record: Professional Offices Inc

17open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 44 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $225,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 96 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 49,815 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing

Open violations

ECB / OATH (9)
IssuedViolationHearingBalance
Jun 17, 2024Construction CLASS - 2
A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MOR
#37028894N
Jan 29, 2026
IN VIOLATION
$0
Feb 28, 2023Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE
#37025346Z
Dec 21, 2023
IN VIOLATION
$0
Nov 1, 2021Construction CLASS - 2
27-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE O
#37022503J
Jul 14, 2022
IN VIOLATION
$0
Apr 1, 2021Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#805002. AGG1 PRIOR NOV 37011458X UNDER 28
#37021172J
Sep 23, 2021
ADMIT/IN-VIO
$0
Jul 13, 2020Construction CLASS - 2
PROVISION OF LAW:27-929.1.A.C.27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19 IN A
#37019905P
Jul 22, 2021
IN VIOLATION
$0
Nov 15, 2019Construction CLASS - 2
A.C 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/2019,IN AN OFFICE BLDG 100 FT OR
#37016682N
Feb 27, 2020
STIPULATION/IN-VIO
$0
Sep 24, 2018Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND ROOF. SKYLITE APPURTENANCES DEFECTIVE CLOSURE. ROOF STORE ROOM WINDOW GLASS AND FRAME DEFECTIVE ORIGINAL WINDOWS NEAR/IN STAIRWELL DOUBLE HUNG WINDOW FRAMES RUST
#35344904J
Jan 24, 2019
IN VIOLATION
$0
May 18, 2018Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 228-302.4 FOR CONTROL#805002. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT
#37011458X
Jan 17, 2019
IN VIOLATION
$0
Jan 27, 2010Construction CLASS - 2
FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORT
#36012320L
Nov 4, 2010
DEFAULT
$0
DOB (4)
IssuedViolationStatus
Jun 2, 2022FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00116
DOB VIOLATION - ACTIVE
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00648
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#01220
DOB VIOLATION - ACTIVE
Mar 31, 2008EMERGENCY POWER

#NRF00923
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Jun 2, 2022Benchmarking - LL84 FTF-EN-BENCH
Active
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
Mar 31, 2008Emergency Power FTF-EL-ENRF
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 10:11 AM ET. BBL 1013950010.

Look up another building