2 floors · 20,050 sq ft · built 1936 · class K2 · owner of record: Quentin Park Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 433 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 17, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB PARAPET VIO #080526PI31501SB AND DOB CONTROL #370408 DATED 08-05-2026. NO COMPLIANCE ONFILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE CO #35733190X | Dec 9, 2026 PENDING | $2,500 |
| Aug 5, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.2 STORY COMMERCIAL USE,CORNER LOT.OBSERVED PARAPET LEANING INWARD,OBSERVED SEVERAL CRACKS IN PARAPET AND BULGING BRICKS AT EXP 2 PARAPET LEVEL.PARAPET IS #35718687X | Nov 30, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Aug 5, 2026 | CONSTRUCTION FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1&2 PARAPET IN DISREPAIR WITH SEVERAL MASONRY CRACKS & DETERIORATED MORTAR JOINTS AT EXP2 PARAPET APPEARS TO BE LEANING INWARD.AN ANNUAL PARAPET OBSERV REPORT IS REQ'D TO BE COMPLED ANNUALLY STARTIN IN 2024. SUBMIT ANNUAL OBSERVATION REPORT FOR 2025 NO #PI31501SB | DOB VIOLATION - ACTIVE |
| Aug 5, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD PARAPET LEANING INWARD AT EXP2 WITH SEVERAL MASONRY CRACKS,MISSING MORTAR JOINTS.AT EXP1 OBSVD MASONRY CRACKS AT PARAPET.AT EXP1&2 OBSVD DETERIORATED/SAGGING WINDOW LINTELS @ 2FL. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB TO EVAL ENTIRE BLDG & SU #PI31502SB | DOB VIOLATION - ACTIVE |
| Aug 5, 2026 | CONSTRUCTION EMERGENCY WORK ORDER-OBSVD IMMED HAZ CONDITIONS AT EXP1&2,PARAPET IS LEANING INWARD AT EXP2.OBSVD SEVERAL CRACKS & MISSING MORTAR JOINTS AT SEVERAL LOCATIONS. OWNER TO IMMED RETAIN DOB REG CONTRACTOR TO INSTALL S/W SHED ALONG THE ENTIRE LENGTH OF EXP1&2. START WORK IMMED, CONTINUE DAILY UNTIL COMPLE #PI31502TC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 15) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 17, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB PARAPET VIO #080526PI31501SB AND DOB CONTROL #370408 DATED 08-05-2026. NO COMPLIANCE ONFILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE CO | Open |
| Aug 5, 2026 | DOB | CONSTRUCTION: FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1&2 PARAPET IN DISREPAIR WITH SEVERAL MASONRY CRACKS & DETERIORATED MORTAR JOINTS AT EXP2 PARAPET APPEARS TO BE LEANING INWARD.AN ANNUAL PARAPET OBSERV REPORT IS REQ'D TO BE COMPLED ANNUALLY STARTIN IN 2024. SUBMIT ANNUAL OBSERVATION REPORT FOR 2025 NO | Open |
| Aug 5, 2026 | DOB | CONSTRUCTION: CORRECTIVE ACTION PLAN REQ'D-OBSVD PARAPET LEANING INWARD AT EXP2 WITH SEVERAL MASONRY CRACKS,MISSING MORTAR JOINTS.AT EXP1 OBSVD MASONRY CRACKS AT PARAPET.AT EXP1&2 OBSVD DETERIORATED/SAGGING WINDOW LINTELS @ 2FL. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB TO EVAL ENTIRE BLDG & SU | Open |
| Aug 5, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER-OBSVD IMMED HAZ CONDITIONS AT EXP1&2,PARAPET IS LEANING INWARD AT EXP2.OBSVD SEVERAL CRACKS & MISSING MORTAR JOINTS AT SEVERAL LOCATIONS. OWNER TO IMMED RETAIN DOB REG CONTRACTOR TO INSTALL S/W SHED ALONG THE ENTIRE LENGTH OF EXP1&2. START WORK IMMED, CONTINUE DAILY UNTIL COMPLE | Open |
| Aug 5, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.2 STORY COMMERCIAL USE,CORNER LOT.OBSERVED PARAPET LEANING INWARD,OBSERVED SEVERAL CRACKS IN PARAPET AND BULGING BRICKS AT EXP 2 PARAPET LEVEL.PARAPET IS | Open |