6 floors · 61 apartments · 57,230 sq ft · built 1930 · class D4 · owner of record: 1201 Shakespeare Ave Hdfc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 57 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 57 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 57 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 73 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 57,230 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 178 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 178 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 301 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2510). Agency page | Dec 31, 2030 in 1518 days | Next due 2030 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 26, 2026 | Boilers CLASS - 2 FOUND FEDERAL FST-125, OIL FIRED BOILER WITH EXPOSED WIRES, BAROMETRIC DAMPER DEFECTIVE, HANDLE MISSING ON DISCHARGE PIPE, OPENINGS ON CEILING AND WALLS,REMOVE ALL COMBUSTIBLE STORAGE, BODY DRAINS MISSING AT SA #39209349N | Jan 15, 2027 PENDING | $1,250 |
| Jul 1, 2026 | Boilers CLASS - 2 FOUND FEDERAL FST 125 OIL FIRED BOILER WITH EXPOSED WIRING, BELT GUARD MISSING AT PUMPSET, BAROMETRIC DAMPER DEFECTIVE, DOG BOLTS MISSING ON BOILER DOORS, REAR CHAMBER DOOR NOT FASTENED PROPERLY, BOILER ROOM DO #39194553L | Sep 18, 2026 ADMIT/IN-VIO | $0 |
| Jun 3, 2026 | Construction CLASS - 3 FAILURE TO PROVIDE KEY FOR ACCESS TO HEATING SYSTEM/BOILER ROOM AS PER HMC 27-2033/COMPLY WITH HMC 27-2033 AND SUBMIT A CERTIFICATE OF CORRECTION; 27-MISC #39190937M | Aug 21, 2026 ADMIT/IN-VIO | $0 |
| Feb 22, 2025 | Construction CLASS - 1 SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO WINDOW MOUNTED AIR CONDITIONER UNIT WITH NO EXTERIOR BRACKET OBSERVED AT 5TH FLOOR LEVEL OF REAR EXPOSURE 2 EXTERIOR WALL, REPAIR AND/REPLACE #39139271L | May 2, 2025 IN VIOLATION | $2,500 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #907629. REMEDY: SUBMIT ACCEPTABLE REQU #37027933M | Aug 23, 2024 IN VIOLATION | $0 |
| Nov 9, 2021 | Construction CLASS - 3 OBSERVED TOP PORTION OF BUILDING'S CHIMNEY (APPRX. 20SF) IS DETERIORATED: LOOSE CEMENT/BRICK PIECES, MASONRY CRACKING., REPAIR AND OR REPLACE #39050826P | Feb 11, 2022 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01450 | DOB VIOLATION - ACTIVE |
| Nov 16, 2021 | ELEVATOR #9028/710179 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 31, 2026 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | — |
| Oct 31, 2026 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | — |
| Oct 31, 2026 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | — |
| Oct 31, 2026 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | — |
| Oct 26, 2026 | A | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 29, 2027 |
| Oct 26, 2026 | A | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LINOLEUM TILES IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 29, 2027 |
| Oct 26, 2026 | A | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE 1ST LIGHT FROM NORTH AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 29, 2027 |
| Oct 26, 2026 | B | Apt 6B · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | A | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE 2ND LIGHT FROM NORTH IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 29, 2027 |
| Oct 26, 2026 | B | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | A | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 29, 2027 |
| Oct 26, 2026 | A | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 29, 2027 |
| Oct 26, 2026 | A | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LINOLEUM TILES IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 29, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT THE CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHUB IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT THE CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL RETURN BUZZER FROM BUILDING ENTRANCE TO THE PANEL AT THE WEST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 8, 2026 |
| Oct 13, 2026 | A | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | B | Apt 6B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 17, 2026 |
| Oct 13, 2026 | A | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 13, 2026 | A | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 16, 2027 |
| Oct 2, 2026 | A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE RECYCLING, DISCARDED TRASH, AT SOUTH YARD | Jan 5, 2027 |
| Sep 17, 2026 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED FLOOR IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 22, 2026 |
| Sep 17, 2026 | A | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 21, 2026 |
| Sep 17, 2026 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 13, 2026 |
| Sep 17, 2026 | C | Apt 6B · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APAR | Oct 13, 2026 |
| Sep 17, 2026 | C | Apt 6B · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF UNCAPPED GAS LINE AT NORTH WALL IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 23, 2026 |
| Aug 18, 2026 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HEAVY DUTY LOCK ASSEMBLY AT FRONT ENTRANCE DOOR TO BUILDING | Sep 22, 2026 |
| Aug 17, 2026 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 12, 2026 |
| Aug 17, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2026 |
| Aug 17, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2026 |
| Aug 17, 2026 | C | Apt 6B · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE UNDER BATHTUB IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2026 |
| Aug 17, 2026 | B | Apt 6B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES FLOOR IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 21, 2026 |
| Aug 13, 2026 | B | § 27-2005 ADM CODE PROVIDE SLIDE BOLT OR HOOK ON ROOF DOOR THAT ALLOWS RE-ENTRY FROM ROOF TO BULKHEAD AT 9TH STORY NORTH SECTION AT PUBLIC HALL | Sep 17, 2026 |
| Aug 13, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING PUSHBAR LOCK INSTALLED ON ROOF DOOR THAT DOESN'T ALLOW RE-ENTRY FROM ROOF TO BULKHEAD AT 9TH STORY SOUTH SECTION AT PUBLIC HALL | Sep 17, 2026 |
| Aug 13, 2026 | C | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING PAPER WEDGE AT 1ST DOOR FROM SOUTH AT 9TH STORY AT PUBLIC HALL | Aug 27, 2026 |
| Aug 13, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FECES, HYPODERMIC NEEDELES, AND RUBBISH AT SOUTH YARD AT PUBLIC HALL | Sep 17, 2026 |
| Aug 13, 2026 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS AT 3RD STORY BALCONY AT 1ST FIRE ESCAPE FROM WEST AT SOUTH EXTERIOR WALL AT FIRE ESCAPE | Sep 17, 2026 |
| Aug 13, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING PUSHBAR LOCK INSTALLED ON ROOF DOOR THAT DOESN'T ALLOW RE-ENTRY FROM ROOF TO BULKHEAD AT 9TH STORY NORTH SECTION AT PUBLIC HALL | Sep 17, 2026 |
| Aug 13, 2026 | B | § 27-2005 ADM CODE PROVIDE SLIDE BOLT OR HOOK INSTALLED ON ROOF DOOR THAT ALLOWS RE-ENTRY FROM ROOF TO BULKHEAD AT 9TH STORY SOUTH SECTION AT PUBLIC HALL | Sep 17, 2026 |
| Jul 10, 2026 | B | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 14, 2026 |
| Jul 10, 2026 | A | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 13, 2026 |
| Jul 10, 2026 | A | Apt 6B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 13, 2026 |
| Jul 10, 2026 | A | Apt 6B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GASKET AT REFREGIRATOR DOOR IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 13, 2026 |
| Jul 10, 2026 | A | Apt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 13, 2026 |
| Jul 7, 2026 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING APPROVE GLASS AT BUILDING ENTRANCE DOOR ( FROM STREET TO VESTIBULE DOOR) AT PUBLIC HALL, 1st STORY | Aug 11, 2026 |
| Jul 7, 2026 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS AT BUILDING ENTRANCE DOOR ( FROM STREET TO VESTIBULE DOOR) AT PUBLIC HALL, 1st STORY | Aug 11, 2026 |
| Jul 6, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS AASSEMBLIES AT BUILDING ENTRANCE DOOR AT BASEMENT | Aug 10, 2026 |
| Jun 2, 2026 | C | Apt 6B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 28, 2026 |
| May 26, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR AT BASEMENT | Jun 1, 2026 |
| May 20, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL CEILING IN THE 1st PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2026 |
| May 20, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2026 |
| May 20, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2026 |
| May 20, 2026 | A | Apt 6B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2026 |
Showing 60 of 356. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 31, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 31, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 31, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 31, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 26, 2026 | ECB | Boilers: FOUND FEDERAL FST-125, OIL FIRED BOILER WITH EXPOSED WIRES, BAROMETRIC DAMPER DEFECTIVE, HANDLE MISSING ON DISCHARGE PIPE, OPENINGS ON CEILING AND WALLS,REMOVE ALL COMBUSTIBLE STORAGE, BODY DRAINS MISSING AT SA | Open |
| Oct 26, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LINOLEUM TILES IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE 1ST LIGHT FROM NORTH AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE 2ND LIGHT FROM NORTH IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LINOLEUM TILES IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT THE CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHUB IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT THE CEILING IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL RETURN BUZZER FROM BUILDING ENTRANCE TO THE PANEL AT THE WEST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 13, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 4, 2026, 1:57 AM ET. BBL 2025100074.