Bronx · Block 2768 · Lot 171 · 10474

1201 Oak Point Avenue

2 floors · 34,500 sq ft · built 1925 · class E9 · owner of record: Haniff Grandchildren'S Inheritance Irrev Ocable Tru

3open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
64dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-23 (Accepted). Agency page

Dec 31, 2026
in 64 days
1 of 1 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 34,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1160 days
Next cycle year 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Oct 2, 2000Construction Non-Hazardous
FAILURE TO MAINTAIN EXTERIOR BLDG. WALL, CRACKED AND DEFECTIVE BRICK EXTERIOR FRONT WALL ALSO HANGING OUT DEFECTIVE CORRIOATED STEEL SHEETING FRONT 2ND FL. FRONT. REMEDY:MAKE NECESSARY REPAIRS IN A SAFE MANNER.
#34253678K
Jun 15, 2001
WRITTEN OFF
$0
DOB (1)
IssuedViolationStatus
May 24, 2018PLUMBING
THE BOROUGH COMMISSIONER HAS ISSUED A 15 DAY LETTER OF INTENT TO REVOKE PLUMBING LAA #240222255 DUE TO AUDIT OBJECTIONS. ALL PLUMBING WORK HAS BEEN ORDERED TO STOP IMMEDIATELY
#APL08AF
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Dec 8, 2025GHG Emissions - LL97 FTF-EN-LL97320
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 11:01 AM ET. BBL 2027680171.

Look up another building