Manhattan · Block 803 · Lot 56 · 10001

120 West 28 Street

4 floors · 38,760 sq ft · built 1900 · class F9 · owner of record: Ohday Realty Corp

10open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
167dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 38,760 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1142 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-12 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (9)
IssuedViolationStatus
Jul 11, 2024CONSTRUCTION
REQUESTING ENGINEERING REPORT DUE TO MULTIPLE CRACKS ON THE FACADE AT EXP# 1 AND 2 OBSERVED AT TIME OF INSPECTION CREATING HAZARDOUS CONDITIONS.
#24-01883
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#04039
DOB VIOLATION - ACTIVE
Jun 26, 2015CONSTRUCTION

#EX0401BT
DOB VIOLATION - ACTIVE
Jun 26, 2014ELEVATOR

#9028/514526
DOB VIOLATION - ACTIVE
Nov 4, 2004CONSTRUCTION

#MTF01RNS
DOB VIOLATION - ACTIVE
Jan 6, 2004CONSTRUCTION

#MTF01RNS
DOB VIOLATION - ACTIVE
Aug 5, 2003CONSTRUCTION

#MTF01RNS
DOB VIOLATION - ACTIVE
Aug 4, 2003CONSTRUCTION

#MTF03RNS
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Jan 22, 1991BOILER

#7046-01
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 12:30 PM ET. BBL 1008030056.

Look up another building