14 floors · 594 apartments · 890,134 sq ft · built 1939 · class D4 · owner of record: Castle Village Ownrs
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual boiler inspection (9 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-25 (Accepted). Agency page | Dec 31, 2026 in 65 days | 4 of 9 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 890,134 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2179). Agency page | Dec 31, 2029 in 1161 days | Next due 2029 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $44,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2026-09-15) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 20, 2026 | Unknown CLASS - 1 FAILURE TO MAINTAIN PARKING STRUCTURE INSAFE CONDITION. AS NOTED AT TIME OF INSPECTION ON AN OCCUPIED CONSISTING OF 4 LEVELS BELOW GRADE, OBSERVED SPALLED/CRACKED CONCRETE AT COLUMNS-BROKEN GLASS WINDOW AND LEA #35730961L | Oct 29, 2026 PENDING | $2,500 |
| Aug 12, 2026 | Construction CLASS - 1 ATOI, OBSERVED DIAGONAL STEP CRACKS, MISSING MORTAR IN SOME OF THE BRICK JOINTS AND A SMALL BULGE AT EXPOSURE 4 (NORTH SIDE) OF INTERIOR SIDE DRIVEWAY WALL., MAINTAIN EXTERIOR BUILDING WALL; REPAIR WALL AND COR #39200364K | May 13, 2027 PENDING | $5,000 |
| Jun 24, 2026 | Unknown CLASS - 2 3314.15.2 OBS SUSPENDED SCAFFOLD IN PLACE&READILY AVAILABLE FOR USE. STIRRUPS WERE INSTALLED APPROXIMATELY 2'-10B=" AND 2'-8" FROM THE ENDS OF THE PLATFORM, EXCEEDING ALLOWABLE LIMITS. STIRRUPS ARE REQUIRED TO #39555848J | Mar 25, 2027 PENDING | $0 |
| Jun 24, 2026 | Construction CLASS - 2 OBS INSTALLATION OF SUSPENDED SCAFFOLD NOT CONFORMING TO APPROVED CD5. MULTIPLE SUSPENSION LINES ATTACHED TO THE SAME ANCHOR POINT.MODULAR PLATFORMS REQUIRED BY APPROVED PLANS WERE NOT PROVIDED. PLATFORMS LACKE #39555847H | Sep 3, 2026 IN VIOLATION | $0 |
| Mar 5, 2026 | Cranes and Derricks CLASS - 2 OBSERVE NO SUSPENDED SCAFFOLD IN PLACE IN CONNECTION WITH OUTRIGGER BEAMS AT ROOF LEVEL LOCATION WITH NO NOTIFICATION ON FILE. UPON FURTHER REVIEW OF THIS INTRANET AND DOB NOW. IT WAS REVEALED THAT NO NOTIFICAT #39551302J | May 14, 2026 ADMIT/IN-VIO | $0 |
| Mar 4, 2026 | Cranes and Derricks CLASS - 2 OBSERVE NO SUSPENDED SCAFFOLD IN PLACE IN USE & IN CONNECTION WITH OUTRIGGER BEAMS AT ROOF LOCATION WITH NO NOTIFICATION ON FILE. UPON FURTHER REVIEW OF BIS INTRANET AND DOB NOW. IT WAS REVEALED THAT NO NOTIFIC #39551297Y | May 14, 2026 ADMIT/IN-VIO | $0 |
| Sep 4, 2025 | Construction CLASS - 2 OBSERVED OPPOSING TIEBACK ON SAME CONNECTION POINT,14 FT SINGLE PIECE I-BEAM DOES NOT SHOW ON THE APPROVED PLAN ,10 INCHES ANCHOR PLATES CONTRARY TO THE DESIGNED, DELTA BEAM CONNECTION MISSING BOLTS, THREE FEET #39544459M | Nov 13, 2025 IN VIOLATION | $625 |
| Sep 4, 2025 | Unknown CLASS - 2 OBSERVED CORNER ANGLE SCAFFOLD INSTALLED & IN USE WITH NO PRE INSPECTION BY THE DEPARTMENT OF BUILDINGS PRIOR TO USE OF CORNER ANGLE SCAFFOLD AS PER BC 3314.16.4 INSPECTION. THE EQUIPMENT SETTING FOR CORNER AND #39544460J | Nov 13, 2025 IN VIOLATION | $2,500 |
| Sep 4, 2025 | Unknown CLASS - 2 AT TIME OF MY INSPECTION I OBSERVED WORK AND STORAGE AT EXPOSURE 1 ADJACENT TO SIDEWALK SHED IN ROADWAY WAS NOT PROVIDED WITH SOLID 4FT BARRIER FOR WORK AND STORAGE ZONE AS REQUIRE BY CODE 3307.4.7 TO ENCLOSED #39544461L | Nov 13, 2025 IN VIOLATION | $2,500 |
| May 10, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE:-AT THE TIME OF INSPECTION OBSERVED: CRACKED/SPALLING CONCRETE ABOVE THE MAIN ENTRANCE DOOR AT EXP #1. SPALLING CONCRETE AND LOOSE MATERIALS #35693806L | Aug 7, 2025 DEFAULT | $25,000 |
| May 10, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION OBSERVED CRACKED BRICK WITH OPEN MORTAR JOINY AT EXPO #1(13 FL). ALSO STEP CRACK AT EXPOSURE #2(13 FLOOR) WITH LOO #35693805J | Aug 7, 2025 DEFAULT | $25,000 |
| Feb 25, 2025 | Construction CLASS - 2 1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS #37033481L | Apr 9, 2027 | $3,125 |
| Feb 25, 2025 | Construction CLASS - 2 1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS #37033458N | Apr 9, 2027 PENDING | $6,250 |
| Feb 25, 2025 | Construction CLASS - 2 1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS #37033457L | Dec 3, 2026 IN VIOLATION | $1,250 |
| Feb 25, 2025 | Construction CLASS - 2 1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS #37033459P | Apr 17, 2026 IN VIOLATION | $1,250 |
| Feb 25, 2025 | Construction CLASS - 2 1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS #37033456J | Oct 14, 2025 IN VIOLATION | $625 |
| Feb 25, 2025 | Construction CLASS - 2 1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESS #37033460M | Apr 17, 2026 IN VIOLATION | $1,250 |
| May 11, 2007 | Site Safety Non-Hazardous SEC.CODE:26-234. FAILURE TO NOTIFY THE DEPT OF BLDGS IN WRITTING THAT A DANGEROUS & UNSAFE CONDITION EXISTED AT THE RETAINING WALL AT PREMI-SES. NOTED: WALL COLLAPSED ON 5/12/05. RESPONDENT WAS AWARE OF DANGER- #34537565Z | Feb 14, 2008 WRITTEN OFF | $0 |
| May 11, 2007 | Site Safety Non-Hazardous SEC.CODE:26-234. FAILURE TO NOTIFY THE DEPT OF BLDGS IN WRITTING THAT A DANGEROUS & UNSAFE CONDITION EXISTED AT THE RETAINING WALL AT PREMI-SES. NOTED: WALL COLLAPSED ON 5/12/05. RESPONDENT WAS AWARE OF DANGER- #34537564R | Jul 12, 2007 WRITTEN OFF | $0 |
| May 11, 2007 | Site Safety Non-Hazardous SEC.CODE:26-234. FAILURE TO NOTIFY THE DEPT OF BLDGS IN WRITTING THAT A DANGEROUS & UNSAFE CONDITION EXISTED AT THE RETAINING WALL AT PREMI-SES. NOTED: WALL COLLAPSED ON 5/12/05. RESPONDENT WAS AWARE OF DANGER- #34537563P | Dec 13, 2007 WRITTEN OFF | $0 |
| May 4, 2006 | Construction Hazardous FAILURE TO MAINTAIN. DEFECTS NOTED:AT REAR OF PREMISES RETAINING WALL HAS SEVERAL DIAGONAL CRACKS,MISSING MORTAR JOINTS. PARAPET WALL ON RETAINING WALL HAS DISPLACEMENT OF CAPSTONE COLUMNS HAS CRACKS & REBARS #34518234K | Sep 21, 2006 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 20, 2026 | CONSTRUCTION EMERGCY WRK ORDR. PRKING STRCTR: 4 LVL, OBSRVD SPALLD/CRACKD CONCRTE@ COLUMNS-DISPLACE PRKING GARAGE RAMP WALL LEANING-BULGED-CRACKING ALONG THE WALL CAUSIN AN IMMDITE HAZRD TO PBLIC & VEHICULR-PEDESTRN TRAFFIC REMDY:IMMEDLY IMPLEMENT ADEQTE SFTY MEAS TO PRTCT UNSF AREAS. RETAIN A NYS RDP TO DIRCT/S #PS11201JL | DOB VIOLATION - ACTIVE |
| Feb 19, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TP SPALLING FACADE DECORATIVE WINDOW LINTEL S TONE AND IMPROPER WINDOW LINTEL INSTALLATION AT EXP1 EAST ELEV ON 11TH FLOOR.REMEDY:IMMEDIATELY TAKE AND PROVIDE SAFETY MEASURES TO SECURE AN D PROTECT THE PUBLIC.MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF A PRO FESSIONAL.ALSO R #FA1201AE | DOB VIOLATION - ACTIVE |
| Dec 15, 2022 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00046 | DOB VIOLATION - ACTIVE |
| Dec 15, 2022 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00048 | DOB VIOLATION - ACTIVE |
| Dec 15, 2022 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00047 | DOB VIOLATION - ACTIVE |
| Feb 18, 2022 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00315 | DOB VIOLATION - ACTIVE |
| Feb 18, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #910036 | DOB VIOLATION - ACTIVE |
| Feb 18, 2022 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00314 | DOB VIOLATION - ACTIVE |
| Feb 18, 2022 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00313 | DOB VIOLATION - ACTIVE |
| Feb 18, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #910103 | DOB VIOLATION - ACTIVE |
| Feb 18, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #910035 | DOB VIOLATION - ACTIVE |
| Mar 18, 2020 | PLUMBING THE BOROUGH COMMISSIONER INTENDS TO REVOKE ALL PLUMBING APPROVALS AND PERMIT IN CONNECTION WITH JOB #140831438 DUE TO REVOCATION OF LICENSE MASTER PLUMBER #1762 , ALL PLUMBING WORK IN CONNECTION WITH ABOVE MENTIONED PERMIT HAS ORDERED STOPPED IMMEDIATELY. #20-00591 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #03136 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #03134 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #03135 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #03137 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #03138 | DOB VIOLATION - ACTIVE |
| Feb 12, 2012 | LL11/98-LOCAL LAW 11/98 - FACADE UNSAFE LOCAL LAW REPORT FILED #HAZ73352 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #00359 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #00358 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #00363 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #00364 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #00362 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #00356 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #00361 | DOB VIOLATION - ACTIVE |
| Jul 14, 2005 | CONSTRUCTION #122AA | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Jul 14, 2005 | CONSTRUCTION #121AA | DOB VIOLATION - ACTIVE |
| May 16, 2005 | IMMEDIATE EMERGENCY AMENDED #75/05A | DOB VIOLATION - ACTIVE |
| May 13, 2005 | IMMEDIATE EMERGENCY #75/05 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 16, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2022 | Retaining Walls FTF-RW-INITL | Active |
| Dec 15, 2022 | Retaining Walls FTF-RW-INITL | Active |
| Dec 15, 2022 | Retaining Walls FTF-RW-INITL | Active |
| Feb 18, 2022 | Facades FISPFCS CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 18, 2022 | Facades FISPFCS CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 18, 2022 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Feb 18, 2022 | Facades FISPFCS CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 18, 2022 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Feb 18, 2022 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 12, 2026 | B | Apt 67 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 67, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Apr 16, 2026 |
| Aug 19, 2025 | B | Apt 77 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 77, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 23, 2025 |
| Sep 20, 2024 | B | Apt 67 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 67, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Oct 25, 2024 |
| May 17, 2021 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Aug 20, 2021 |
| May 17, 2021 | A | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY | Aug 20, 2021 |
| May 17, 2021 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Aug 20, 2021 |
| May 17, 2021 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Aug 20, 2021 |
| Dec 21, 2015 | A | SECTION 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Mar 25, 2016 |
| Jun 18, 2008 | B | Apt 111 · D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMPNESS PENETRATING WEST WALL OF CLOTHES CLOSET 11TH STY WEST APT 111 REAR WEST ROOM. LOCATED AT APT 111 | Jul 23, 2008 |
| Jun 18, 2008 | B | Apt 94 · D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMPNESS PENETRATING EAST WALL 9TH STY CENTER NORTH APT 94 FRONT EAST ROOM EAST WING. , SECTION '' '' | Jul 23, 2008 |
| Jun 18, 2008 | B | Apt 111 · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CAULKING OF BATHTUB 11TH STY WEST APT 111 BATHROOM. LOCATED AT APT 111 | Jul 23, 2008 |
| Jun 18, 2008 | A | Apt 82 · D26-10.01 ADM CODE REFIT OVEN DOOR OF GAS RANGE 8TH STY CENTER SOUTH APT 82 KITCHEN. , SECTION '' '' | Sep 21, 2008 |
| Jun 18, 2008 | A | Apt 111 · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS NORTHWEST ROOM AND CLOSET AT NORTHWEST ROOM REAR WEST SECTION 1ST STY WEST APT 111. LOCATED AT APT 111 | Sep 21, 2008 |
| Jun 18, 2008 | B | D26-20.08,20.09 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS 1ST STY WEST REAR WEST SECTION 111 MISSING. | Jul 23, 2008 |
| Jun 18, 2008 | B | Apt 95 · D26-20.08,20.09 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS 9TH STY SOUTHWEST SECTION EAST APT 95 MISSING. LOCATED AT APT 95 | Jul 23, 2008 |
| Jun 18, 2008 | A | Apt 95 · D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING CAULKING AROUND OF KITCHEN SINK 9TH STY SOUTHEAST SECTIN EAST APT 95. LOCATED AT APT 95 | Sep 21, 2008 |
| Jun 18, 2008 | B | Apt 9TH · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE WINDOWS ENTRANCE APT 9TH STY SOUTHEAST SECTION EAST APT 95. LOCATED AT APT 9TH | Jul 23, 2008 |
| Jun 18, 2008 | A | Apt 95 · D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE STRIKE PLATE OF DOOR OF KITCHEN 9TH STY SOUTHEAST SECTION EAST APT 95. LOCATED AT APT 95 | Sep 21, 2008 |
| Jun 18, 2008 | A | Apt 111 · D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS 11TH STY WEST APT 111 AT SHOWER STALL WATER CLOSET COMPARTMENT NORTH WALL FOYER AND EAST WALL SOUTH ROOM. LOCATED AT APT 111 | Sep 21, 2008 |
| Jul 28, 2006 | A | Apt 114 · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING 11 STY SOUTH APT 114 PRIVATE HALLWAY. , SECTION '' '' | Nov 12, 2006 |
| Jul 28, 2006 | A | SECTION 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Nov 12, 2006 |
| Aug 3, 1999 | C | SECTION 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING 1 STY PUBLIC HALL. | Aug 23, 1999 |
| Jan 25, 1994 | B | Apt 114 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING 11 STY SOUTH APT 114 SOUTHEAST ROOM. , SECTION '' '' | Mar 14, 1994 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 16, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 20, 2026 | DOB | CONSTRUCTION: EMERGCY WRK ORDR. PRKING STRCTR: 4 LVL, OBSRVD SPALLD/CRACKD CONCRTE@ COLUMNS-DISPLACE PRKING GARAGE RAMP WALL LEANING-BULGED-CRACKING ALONG THE WALL CAUSIN AN IMMDITE HAZRD TO PBLIC & VEHICULR-PEDESTRN TRAFFIC REMDY:IMMEDLY IMPLEMENT ADEQTE SFTY MEAS TO PRTCT UNSF AREAS. RETAIN A NYS RDP TO DIRCT/S | Open |
| Aug 20, 2026 | ECB | Unknown: FAILURE TO MAINTAIN PARKING STRUCTURE INSAFE CONDITION. AS NOTED AT TIME OF INSPECTION ON AN OCCUPIED CONSISTING OF 4 LEVELS BELOW GRADE, OBSERVED SPALLED/CRACKED CONCRETE AT COLUMNS-BROKEN GLASS WINDOW AND LEA | Open |
| Aug 12, 2026 | ECB | Construction: ATOI, OBSERVED DIAGONAL STEP CRACKS, MISSING MORTAR IN SOME OF THE BRICK JOINTS AND A SMALL BULGE AT EXPOSURE 4 (NORTH SIDE) OF INTERIOR SIDE DRIVEWAY WALL., MAINTAIN EXTERIOR BUILDING WALL; REPAIR WALL AND COR | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 4:46 PM ET. BBL 1021790010.