Queens · Block 12033 · Lot 10 · 11436

120-25 141 Street

3 floors · 22,176 sq ft · built 1929 · class W2 · owner of record: St Clement Pope R C C

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
417dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 52 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 417 days
Next cycle year 2027
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-16 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Aug 5, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:ROOF EXTERIOR EXIT DOOR DOES NOT HAVE PUSH BAR TO EXIT IT HAS DOOR KNOB ON IT,DOOR NE
#35734881J
Aug 24, 2026
POP/IN-VIO
$0
Aug 5, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BASEMENT,GAS METER ROOM IS BEING USED AS CUSTODIAN'S OFFICE WITH COUCH,CHAIRS2 FILE CABINETS,1 DESK AND COAT RACK,NO STORAGE PERMITTED IN GAS METER
#35734880H
Aug 24, 2026
POP/IN-VIO
$0
Jun 16, 2009Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR WALL NOTED:NORTHSIDE EXTERIOR WALL W/ WATER PENETRATION REMEDY:SEAL ALL PENETRATION
#34779815Y
Aug 11, 2009
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (4)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 5, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:ROOF EXTERIOR EXIT DOOR DOES NOT HAVE PUSH BAR TO EXIT IT HAS DOOR KNOB ON IT,DOOR NEOpen
Aug 5, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BASEMENT,GAS METER ROOM IS BEING USED AS CUSTODIAN'S OFFICE WITH COUCH,CHAIRS2 FILE CABINETS,1 DESK AND COAT RACK,NO STORAGE PERMITTED IN GAS METEROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 9, 2026, 6:54 PM ET. BBL 4120330010.

Look up another building