3 floors · 6 apartments · 5,472 sq ft · built 1931 · class C2 · owner of record: 1215 Frisco Avenue Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-12-13 (Accepted). Agency page | Dec 31, 2026 in 43 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 22, 2023 | Boilers CLASS - 2 SEAL ALL HOLES IN BOILER ROOM,FIRE PROOF CEILING,SPILL SWITCH MISSING ,FIRE DAMPER MISSING FOR COMBUSTION AIR,CHECK VALVE MISSING AFTER FEEDER,PRESSURE GAUGE BROKEN,NEED DISCHARGE ON BACKFLOW,REMOVE OLD OIL LIN #39080105M | May 2, 2023 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17316 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #12705 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #33084 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #12229 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #33596 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 14) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 19, 2026 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS 3RD STORY WEST 1 APARTMENT 3R UNDER VACATE ORDER # 260547 POSTED ON 03/19/2026 EFFECTIVE DATE 03/20/2026 IN THE ENTIRE APARTMENT LOCATED AT APT | — |
| Jul 30, 2026 | B | Apt 1L · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS ,AT BATHTUB IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 3, 2026 |
| Jul 30, 2026 | B | Apt 1L · § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 3, 2026 |
| Jul 30, 2026 | A | Apt 1L · § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 2, 2026 |
| Jul 30, 2026 | C | Apt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 25, 2026 |
| Jul 30, 2026 | A | Apt 1L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE REFRIGERATOR DOOR GASKET IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 2, 2026 |
| May 7, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 10, 2026 |
| Mar 18, 2026 | C | Apt 3R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 24, 2026 |
| Mar 16, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES FLOORING. AT PUBLIC HALL, 3rd STORY | Apr 20, 2026 |
| Aug 21, 2024 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE AT BASEMENT | Sep 16, 2024 |
| Jul 29, 2024 | A | Apt 1L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 1, 2024 |
| Jul 29, 2024 | A | Apt 1L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH 1 DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 1, 2024 |
| Jan 3, 2024 | C | Apt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 29, 2024 |
| Jan 3, 2024 | C | Apt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 29, 2024 |
| Jan 2, 2024 | C | Apt 2R · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 1, 2024 |
| Jan 2, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED AT BASEMENT AT BOILER ROOM | Jan 8, 2024 |
| Dec 12, 2023 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRIC OUTLETS 1ST,2ND AND 3RD STORIES. AT PUBLIC HALL | Jan 16, 2024 |
| Mar 8, 2023 | C | Apt 2R · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 22, 2023 |
| Dec 12, 2022 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIALS AT PUBLIC HALL, 1st STORY | Jan 16, 2023 |
| Nov 15, 2021 | B | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL/BUZZ INTERCOM SYSTEM FROM BUILDING VESTIBULE TO FOYER LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 20, 2021 |
| Nov 15, 2021 | B | Apt 1L · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASH COUNTER BALANCE AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 20, 2021 |
| Apr 23, 2020 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF FURNITURE, 3RD STORY AND BULKHEAD TO ROOF, PUBLIC HALL STAIRS | May 28, 2020 |
| Apr 15, 2020 | A | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM IN THE PRIVATE HALLWAY LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 19, 2020 |
| Apr 8, 2020 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Jul 12, 2020 |
| Mar 2, 2020 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR | Mar 10, 2020 |
| Dec 9, 2019 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Mar 13, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS ,AT BATHTUB IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Jul 30, 2026 | HPD B | § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Jul 30, 2026 | HPD A | § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Jul 30, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Jul 30, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE REFRIGERATOR DOOR GASKET IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 6:44 PM ET. BBL 4156140001.