Brooklyn · Block 2572 · Lot 48 · 11222

119A Calyer Street

3 floors · 3 apartments · 1,794 sq ft · built 1910 · class C0 · owner of record: 119a Calyer Llc

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 795 days
Next cycle year 2028

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Jun 4, 2003Construction Hazardous
OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS CELLAR TO BE LEGALLY OCCUPIED AS STORAGE AND BOILER ROOM ILLEGAL OCCUPANCY NOTED AT CELLAR LEVEL PARTITIONS ERECTED TO CREATED A CLASS A APARTMENT WITH 3 PIECES
#34407807R
Jun 28, 2004
WRITTEN OFF
$0
Jun 4, 2003Construction Hazardous
FAILURE TO PROVIDE AT LEAST 2 MEANS OF EGRESS NOTED AT CELLAR LEVEL CELLAR YS OCCUPIED AS CLASS A APARTMENT WITHOUT SECOND MEANS OF EGRESS REMEDY: PROVIDE REQUIRED MEANS OF EGRESS
#34407808Z
Jun 28, 2004
WRITTEN OFF
$0
Jun 4, 2003Construction Hazardous
WORK WITHOUT A PERMIT WORK NOTED AT CELLAR LEVEL PARTITIONS ERECTED TO CREATE A CLASS A APARTMENT WITH A 3 PC BATHROOM KITCHEN WITH GAS STOVE REMEDY: OBTAIN A PERMIT OR RESTORE TO PRIOR LEGAL CONDITION
#34407809K
Jun 28, 2004
WRITTEN OFF
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (2) · C 0 · B 1 · A 1
IssuedClassViolationCorrect by
Jul 17, 2006B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING METAL BALUSTERS AT STAIRCASE FRONT AREAWAYAug 26, 2006
Jul 17, 2006A§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT METAL STAIRCASE AT FRONT AREAWAYOct 25, 2006

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 5:09 AM ET. BBL 3025720048.

Look up another building