2 floors · 3 apartments · 2,922 sq ft · built 1901 · class C0 · owner of record: Benjamin, Steve
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 311 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 20, 2016 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOV #35148812Y ISSUED ON 02/16/16 & TO FILE A C OF C PURSUANT TO 28-201.1,28-204.4 & 1RCNY102-01. FOR WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE #35185854P | Jul 11, 2016 IN VIOLATION | $0 |
| Feb 16, 2016 | Construction CLASS - 1 *FSWO* WORK W/O PERMIT.NOTE:BASEMENT LVL APT NEW SHEETROCK CEILING A WALL AND ( ) PLUMBING WORK FOR BATHROOM/KITCHEN ELEC WIRING AT VARIOUS LOCATIONS.*STOP ALL WORK* REM:OBTAIN A PERMIT CALL OFFICE PRIOR TO BEG #35148812Y | Apr 4, 2016 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 18, 2016 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00177 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| May 18, 2016 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 19, 2008 | A | SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING FRAME. | Sep 22, 2008 |
| Jun 19, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PLASTERBOARD ENCLOSURE ERECTED IN CELLAR AT REAR. | Sep 22, 2008 |
| Jun 19, 2008 | A | SECTION 178, 217 M/D LAW MAKE EFFECTIVE THE LIGHT AND VENTILATION OF SKYLIGHT BY REMOVING FROM BENEATH SAME THE DOMELIGHT LOCATED IN CEILING 2 STY PUB HALL. | Sep 22, 2008 |
| Jun 19, 2008 | B | D26-11.01, 11.03, 11.05 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CELLAR THRU OUT. | Jul 24, 2008 |
| Jun 19, 2008 | B | D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF STORAGE OF REFRIGERATOR WITH DOOR & LOCKING DEVICE INTACT AT CELLAR. | Jul 24, 2008 |
| Jun 19, 2008 | A | D26-10.01 ADM CODE REFIT DOOR BOILER ROOM CELLAR FRONT. | Sep 22, 2008 |
| Jun 19, 2008 | B | D26-10.01, 10.05 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ARTICLES AT BASEMENT PUBLIC HALL. | Jul 24, 2008 |
| Jun 19, 2008 | B | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTER BOARD WALL SCUTTLE RECESS 2 STY PUBLIC HALL. | Jul 24, 2008 |
| Jun 19, 2008 | A | D26-41.15 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Sep 22, 2008 |
| Jun 23, 2003 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS REQUIRED | Aug 2, 2003 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 5:43 PM ET. BBL 3013700026.