5 floors · 11 apartments · 9,535 sq ft · built 1910 · class C4 · owner of record: Amsterdam Garvey Housing Development Fun D Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-08 (Accepted). Agency page | Dec 31, 2026 in 47 days | 2 of 4 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 26, 2026 | C | Apt 5B · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 1, 2026 |
| Oct 26, 2026 | C | Apt 5B · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT DOOR IN THE ENTRANCE LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 9, 2026 |
| Oct 26, 2026 | C | Apt 5B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE LOOSE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 1, 2026 |
| Aug 28, 2025 | C | Apt 3C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER SASH AT 1ST WINDOW AT NORTH IN THE 1st ROOM FROM NORTH LOCATED AT APT 3C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 3, 2025 |
| Aug 27, 2025 | B | Apt 3C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 3C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 1, 2025 |
| Aug 27, 2025 | B | Apt 3C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 1, 2025 |
| Aug 27, 2025 | B | Apt 3C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 1, 2025 |
| May 21, 2025 | A | Apt 4B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WOODEN CABINET DOORS AT WEST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 24, 2025 |
| May 21, 2025 | A | Apt 4B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 24, 2025 |
| May 21, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT VESTIBULE NORTH WALL , 1st STORY | Aug 24, 2025 |
| Jun 6, 2024 | B | § 53,187,231 M/D LAW & DEPT RULES & REG. PROVIDE MEANS OF EGRESS FROM YARD TO STREET BY FIREPROOF PASSAGEWAY FOR WHICH APPLICATION MUST BE FILED FOR APPROVAL,OR BY UNLOCKED DOOR OR GATE IN FENCE TO ADJOINING PREMISES WITH CONSENT OF ADJACENT OWNER. | Jul 11, 2024 |
| Feb 21, 2024 | B | Apt 5B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EXTERIOR GLASS PANE AT LOWER WINDOW SASH IN THE 2nd ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 27, 2024 |
| Jul 12, 2023 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 19, 2023 |
| May 15, 2018 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 12, 2018 |
| May 15, 2018 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 12, 2018 |
| Nov 18, 2016 | A | Apt 3C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING, IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, APARTMENT AT WEST | Feb 21, 2017 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 26, 2026 | HPD C | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 26, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT DOOR IN THE ENTRANCE LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 26, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE LOOSE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 2:47 PM ET. BBL 1019140023.