6 floors · 48 apartments · 39,456 sq ft · built 1924 · class D1 · owner of record: 119 Grand Realty
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,456 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8B AND 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #907102. AGG2 HISTORY OF NONCOMP #37027532L | Jul 11, 2024 IN VIOLATION | $0 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#807102.AGG2 HISTORY OF NONCOMPLIANCE ON #37022777R | Feb 2, 2023 IN VIOLATION | $0 |
| Jun 1, 2021 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#807102.AGG1:PRIOR NOV 37013532Y UNDER 2 #37021318N | Feb 17, 2022 IN VIOLATION | $0 |
| Oct 15, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL# 807102. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT. #37013532Y | Sep 19, 2019 IN VIOLATION | $0 |
| Dec 20, 2016 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG FACADE.NOTE: EXP #1,WEST ELEVATION:DAMAGED,CRACKED WINDOW SILLS (2ND,3RD,4TH,5TH&6TH FLR),INADEQUATE AC SUPPORTS (5TH FLR),RUSTED LINTEL &DAMAGED MASONRY MORTAR JOINT(3RD FLR). #35210204P | Jul 6, 2017 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO DISLODGED PARAPET WALL OF SOUTH WEST CORNER AT EXPO 1 WEST FACADE PARAPET LEVEL. REMEDY: OWNER TO IMMEDIATELY MAINTAIN THE DEFECTED PARAPET WALL/MAKE NECESSARY STABILIZING AND REPAIR/REPLACE WORK UNDER SUPERVISION OF NEW YORK STATE REGISTERED P.E./QEWI #LL11202YC | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01590 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2101137 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01030 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #00763 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Aug 30, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2025 |
| Apr 21, 2025 | B | Apt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 26, 2025 |
| Apr 21, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Jul 25, 2025 |
| Apr 21, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 2nd CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, BASEBOARD AT SOUTH WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 2nd CLOSET FROM EAST AT SOUTH WALL DOOR, BASEBOARD AT SOUTH | Jul 25, 2025 |
| Apr 21, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL, NORTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL, EAST WALL IN THE KIT | Jul 25, 2025 |
| Apr 21, 2025 | B | Apt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 26, 2025 |
| Apr 21, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS CEILING AT PUBLIC HALL, 6th STORY | Apr 27, 2025 |
| Apr 21, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL AND CEILING AT PUBLIC HALL, 6th STORY | Jul 25, 2025 |
| Apr 21, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS EAST WALL AT PUBLIC HALL, 6th STORY | May 26, 2025 |
| Apr 21, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 6th STORY | May 26, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6A | May 15, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) EAS | May 15, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) SOU | May 15, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT WEST WALL, NORTH WALL, WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCAT | May 15, 2025 |
| Apr 21, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Jul 25, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE FOYER LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) SOU | May 15, 2025 |
| Apr 21, 2025 | C | Apt 6A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2025 |
| Apr 21, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT 1st PUBLIC HALL FROM NORTH, 6th STORY | Jul 25, 2025 |
| Apr 21, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT 1st PUBLIC HALL FROM NORTH, 6th STORY | May 26, 2025 |
| Apr 21, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT 1st PUBLIC HALL FROM NORTH, 6th STORY | May 26, 2025 |
| Apr 21, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH | Jul 25, 2025 |
| Apr 21, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT BULKHEAD AT 1st PUBLIC HALL BULKHEAD FROM NORTH | May 26, 2025 |
| Apr 21, 2025 | B | Apt 6A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VYNIL TILES AT FLOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 26, 2025 |
| Apr 21, 2025 | B | Apt 6A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 26, 2025 |
| Apr 21, 2025 | B | Apt 6A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE FRAME AT DOOR IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 26, 2025 |
| Apr 21, 2025 | B | Apt 6A · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 26, 2025 |
| Apr 21, 2025 | B | Apt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 26, 2025 |
| Apr 21, 2025 | B | Apt 6A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 26, 2025 |
| Apr 21, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Jul 25, 2025 |
| Apr 21, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Jul 25, 2025 |
| Apr 18, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT EAST WALL AT PUBLIC HALL, 6th STORY | May 23, 2025 |
| Apr 18, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY | Apr 24, 2025 |
| Apr 18, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT PUBLIC HALL, 6th STORY | Jul 22, 2025 |
| Apr 18, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 6th STORY | May 23, 2025 |
| Apr 17, 2025 | B | Apt 6A · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 22, 2025 |
| Apr 17, 2025 | B | Apt 6A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 22, 2025 |
| Apr 17, 2025 | B | Apt 6A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | May 22, 2025 |
| Apr 16, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST WALL AT PUBLIC HALL, 6th STORY | May 21, 2025 |
| Apr 16, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE ENTRANCE LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 21, 2025 |
| Apr 16, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT PUBLIC HALL, 6th STORY | Jul 20, 2025 |
| Apr 16, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 21, 2025 |
| Apr 16, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 21, 2025 |
| Apr 4, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 9, 2025 |
| Apr 4, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 9, 2025 |
| Apr 4, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE FOYER LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 9, 2025 |
| Apr 4, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 9, 2025 |
| Apr 4, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 6th STORY | May 9, 2025 |
| Apr 4, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AND EAST WALL AT PUBLIC HALL, 6th STORY | May 9, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND EAST WALL AT PUBLIC HALL, 6th STORY | Jul 8, 2025 |
| Jan 14, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY | Jan 20, 2025 |
| Jan 14, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 6th STORY | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE FOYER LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 6H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | C | Apt 6H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 9, 2025 |
Showing 60 of 96. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 11:46 PM ET. BBL 1021280031.