Queens · Block 9487 · Lot 7 · 11419

119-14 101 Avenue

2 floors · 2 apartments · 2,280 sq ft · built 2003 · class K4 · owner of record: Blueridge Ny, Inc.

3open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 62 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Dec 30, 2008Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED PLANS/APPLICATION. NOTE:(CURE) CUT IS APPROX 15FEET EXCEEDING PERMITTED SIZE OF 10 FEET JOB #401641826. REMEDY: CONFORM TO PLANS & APPLICATION.
#34737161Z
Mar 10, 2009
WRITTEN OFF
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
HPD (1) · C 0 · B 0 · A 1
IssuedClassViolationCorrect by
Jun 13, 2024A§ 27-2023 ADMIN. CODE: PROVIDE SUFFICIENT,PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.Sep 16, 2024

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 11:53 PM ET. BBL 4094870007.

Look up another building