Manhattan · Block 1863 · Lot 45 · 10025

118 West 109 Street

5 floors · 15 apartments · 9,435 sq ft · built 1900 · class C4 · owner of record: Hp Morningside Heights Portfolio Housing

8open violations
$3,750ECB/OATH penalties owed
3HPD class C (immediately hazardous)
43dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 43 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 59 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1139 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3) · $3,750 owed
IssuedViolationHearingBalance
Sep 29, 2023Construction CLASS - 1
AT TIME OF INSPECTION, AT APT #1E, STAIRCASE FROM 1ST FLOOR TO CELLAR & 2 ROOMS & 2 PC BATH CREATED, WITHOUT PERMITS, OBTAIN PERMIT; OBTAIN ALL PERMITS OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
#39096077K
Jun 6, 2024
IN VIOLATION
$2,500
Sep 29, 2023Construction CLASS - 1
AT TIME OF INSPECTION, APT #1E CONVERTED TO DUPLEX WITH 2 ROOMS & 2 PIECE BATH AT CELLAR, CONTRARY TO CITY RECORDS, DISCONTINUE ILLEGAL OCCUPANCY OR AMEND C OF O; OBTAIN CERTIFICATE OF OCCUPANCY OR RESTORE PREM
#39096076Z
Dec 12, 2024
IN VIOLATION
$1,250
Aug 16, 2023Construction CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY COFO AND DEPARTMENT OF BUILDINGSRECORDS FLOOR PROCEED AND STAIRS INSTALLED ILLEGALLY CREATING DUPLEX AT FIRST STORY & CELLAR LOCATED AT APT 1E,1ST STORY AND APARTMENT FROM
#35243679J
Apr 11, 2024
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (5) · C 3 · B 1 · A 1
IssuedClassViolationCorrect by
Jul 13, 2023CApt 5R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROAug 6, 2023
Aug 3, 2022AApt 5R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION STUD AND SHEETROCK WALL ERECTED FROM FLOOR TO CEILING WITH DOOR OPENING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 5R, 5th STORY, 1sNov 6, 2022
Aug 3, 2022BApt 5R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT ROOM DOOR LEADING TO FIRE ESCAPE WINDOW IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHSep 7, 2022
Apr 18, 2022CApt 5R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st RISER FROM EAST AT SOUTH WALL, NORTH WALL, SOUTH WALL, EAST WALL, WEST WMay 12, 2022
Nov 8, 2021CApt 5R · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH ADec 16, 2021

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 1:22 AM ET. BBL 1018630045.

Look up another building