Manhattan · Block 1276 · Lot 33 · 10017

118 Park Avenue

26 floors · 600,000 sq ft · built 1981 · class O4 · owner of record: 120 Park Avenue Associates Llc

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
51dto Energy audit and retro-commissioning (2026)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1276). Agency page

Dec 31, 2026
in 51 days
Due this year
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 600,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 172 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 172 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1147 days
Next cycle year 2029
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $65,100 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2025-11-17)

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Jan 3, 2025Zoning CLASS - 2
AT TIME OF INSPECTION, POPS CONTRARY TO AMENITIES LIST PROVIDED BY DCP, PAGE 6 OF 7 REFLECTS SEATING LEDGES TO BE USED BY THE PUBLIC. PROHIBITIVE METAL RAIL AS DESCRIBED IN SUMMONS # 35644131L ISSUED OM 1/28/22
#39135668L
Feb 5, 2026
IN VIOLATION
$0
Jan 28, 2022Zoning CLASS - 2
VIOLATION OF DISCRETIONARY ZONING CONDITIONS OF PRIVATELY OWNED PUBLICSPACES.NOTE AT TIME OF INSPECTION PLAZA DESIGN BASED ON DRAWING PLAN Z-5 DATED 10/3/83 A SCULPTURE AMENITIES IN COVERED PEDESTRIAN SPACE IN
#35644131L
Mar 23, 2023
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Jan 9, 2007ELEVATOR

#9011/186655
DOB VIOLATION - ACTIVE
Aug 13, 1991CONSTRUCTION

#C3AL01
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 5:02 AM ET. BBL 1012760033.

Look up another building