1 floors · 3,600 sq ft · built 2004 · class M9 · owner of record: La Iglesia De Dios Israelita Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 42 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 22, 2026 | Construction CLASS - 1 FAILURE TO COMPLY TO COMMISSIONER'S ORDER TO OBTAIN AN ENGINEERING REPORT FOR VIOLATION # 091825P140901ZT. AS OF 7/22/2026, NO ENGINEERING REPORT CORRECTIVE ACTION PLAN HAS BEEN FILED WITHIN DEPT. RECORDS., COM #39197118K | Sep 29, 2026 DEFAULT | $6,280 |
| Nov 13, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER VIO #091825PI40901ZT CONTROL #341443. DATED 9/18/25. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S ORDER. #35718975K | Sep 14, 2026 DEFAULT | $25,000 |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER 341418(072225PI40901HZ)DATED 07/27/2025 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/22/2025 & START BLDG REPAIRS UNDER PERMIT BY 9/22/25 COMPL&SIGNED OFF BY 10/22/25. IMMED COMPLY W/COMMISSIONER'S ORDER 341418(072225PI40901HZ) TO PROV A CORRECTIVE ACTION PLAN #PI40901ZT | DOB VIOLATION - ACTIVE |
| Jul 22, 2025 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD A FREE STANDING & UNBRACED RAISED PARAPET WALL HEIGHT IN HAZ CONDITION,LEANING TWARDS & OVER FRONT ENTRANCE INTO BLDG. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDIN GS.NYC.GOV BY 8/22/25,BLD #PI40901HZ | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 4:54 AM ET. BBL 4093280005.