4 floors · 16 apartments · 9,964 sq ft · built 1910 · class C1 · owner of record: Fulton I Realty, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 16, 2003 | Quality of Life Hazardous RESIDENCE ALTERED FOR OCCUPANCY AS ADWELLING FOR MORE THAN THE LEGALLYAPPROVED NUMBER OF FAMILIES DEPARTMENT RECORDS FROM LEGAL USE:OPEN BA SEMENT TO ILLEGAL USE:(2)TWO S-R-O IN THE BASEMENT NO SPRINKLER.REMEDY #34412004J | Nov 7, 2003 WRITTEN OFF | $0 |
| Sep 16, 2003 | Construction Non-Hazardous WORK W/O A PERMIT.WORK NOTED. 1)HAVING INSTALLED A 3 PIECE BATHROOM AT BASEMENT. 2)HAVING INSTALLED PARTITIONS AT BASEMENT TO CREATE ILLEGALS.R.O. 3)REMOVED PORTION OF BRICK WALL 2 FEETX2FEET OF FIRE WALL #34412003H | Nov 7, 2003 DEFAULT | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 2, 2026 | B | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ. FT. AT WOOD FLOOR AT SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18681959 ISSUED 03-MAR-26 HAS BEEN UPGRADED TO CLASS B PER ADM | Aug 6, 2026 |
| Mar 4, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2026 |
| Mar 4, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUPLING RELEASING WATER FROM SOUTH RADIATOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2026 |
| Mar 4, 2026 | C | Apt 2B · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SLIDABLE BOLT WITH AN EYE INSTALLED AT DOOR CAPABLE OF BEING PADLOCK IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 10, 2026 |
| Mar 4, 2026 | C | Apt 2B · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 1 IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APAR | Mar 30, 2026 |
| Mar 4, 2026 | B | Apt 2B · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2026 |
| Mar 4, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 8, 2026 |
| Feb 8, 2024 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LOWER WINDOW SASH AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 14, 2024 |
| Jan 19, 2022 | B | Apt 2B · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SLIIDE BOLT WITH EYE FOR PADLOCK INSTALLED AT DOOR IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 23, 2022 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 12:41 PM ET. BBL 2026090049.