3 floors · 5 apartments · 3,536 sq ft · built 1896 · class C2 · owner of record: 117 W 119 St Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 776 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-02 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #09278 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 1, 2026 | B | Apt 7 · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE PIPE AT SINK IN BASEMENT LEVEL IN THE KITCHENETTE LOCATED AT B-ROOM 7, 2nd B-ROOM FROM SOUTH AT WEST | Jun 5, 2026 |
| Apr 30, 2026 | A | Apt 7 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE BATHROOM LOCATED AT B-ROOM 7 | Aug 3, 2026 |
| Apr 30, 2026 | C | Apt 7 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET IN THE 3rd ENTRANCE FROM EAST LOCATED AT B-ROOM 7, 2nd B-ROOM FROM SOUTH AT WEST | May 14, 2026 |
| Apr 30, 2026 | A | Apt 7 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE KITCHENETTE LOCATED AT B-ROOM 7 | Aug 3, 2026 |
| Apr 30, 2026 | A | Apt 7 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABNET AT SOUTH WALL IN THE KITCHENETTE LOCATED AT B-ROOM 7 | Aug 3, 2026 |
| Apr 30, 2026 | A | Apt 7 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHENETTE LOCATED AT B-ROOM 7, 2nd B-ROOM FROM SOUTH AT WEST | Aug 3, 2026 |
| Apr 30, 2026 | A | Apt 7 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE KITCHENETTE LOCATED AT B-ROOM 7 | Aug 3, 2026 |
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Jan 29, 2026 | C | Apt 1 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 12, 2026 |
| Jan 29, 2026 | C | Apt 1 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 28, 2026 |
| Feb 23, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CLOSER ARM AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Mar 8, 2024 |
| Jun 24, 2016 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT B-ROOM 3, 2nd STORY, 1st B-ROOM FROM WEST AT NORTH | Jul 29, 2016 |
| Jun 24, 2016 | A | Apt 3 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING PRIVACY LOCK AT DOOR IN THE BATHROOM LOCATED AT B-ROOM 3, 2nd STORY, 1st B-ROOM FROM WEST AT NORTH | Sep 27, 2016 |
| Jul 6, 2015 | B | Apt 5 · § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION CONSISTING OF B-ROOMS CONVERTED TO CLASS A APARTMENTS IN THE ROOM LOCATED AT B-ROOM 5, 3rd STORY, 1st B-ROOM FROM WEST AT NORTH | Aug 10, 2015 |
| Jan 28, 2013 | B | Apt 5 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE OF THE WINDOW ( BOTTOM SASH ) IN THE BATHROOM LOCATED AT APT 5, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 4, 2013 |
| Jan 28, 2013 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK ASSEMBLY AT THE ENTRANCE DOOR TO THE BUILDING , 1st STORY | Mar 4, 2013 |
| Nov 9, 2009 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 14, 2009 |
| Jul 21, 2009 | B | Apt 4 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIAL BELL BUZZER INTERCOM SYSTEM IN THE ENTRANCE LOCATED AT APT 4, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 25, 2009 |
| Jul 21, 2009 | B | Apt 4 · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 25, 2009 |
| Jul 9, 2008 | B | Apt 4 · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 13, 2008 |
| Jul 9, 2008 | A | Apt 4 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 12, 2008 |
| Jul 7, 2008 | B | Apt 4 · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 11, 2008 |
| Jul 7, 2008 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 11, 2008 |
| Jun 12, 2008 | A | D26-31.09 ADM CODE PROVIDE UNDER COMPLETED PERMIT SANITARY FACILITIES FOR EACH 6 PERSONS OR REMAINDER THEREOF FOR CLASS B ROOMS BY INSTALLING 3 WASH BASINS & 3 BATHTUBS OR SHOWERS. | Sep 15, 2008 |
| Jun 12, 2008 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION BASEMENT REAR ROOM COMPLETE BATHROOM INSTALLED. | Sep 15, 2008 |
| Jun 12, 2008 | A | D26-31.09 ADM CODE PROVIDE AT LEAST ONE WATER CLOSET ON THE SAME FLOOR FOR THE ROOMS USED FOR CLASS B OCCUPANCY. WORK MUST BE COMPLETED UNDER PERMIT AT BASEMENT. | Sep 15, 2008 |
| Jun 12, 2008 | A | D26-31.09 ADM CODE PROVIDE AT LEAST ONE WATER CLOSET ON THE SAME FLOOR FOR THE ROOMS USED FOR CLASS B OCCUPANCY. WORK MUST BE COMPLETED UNDER PERMIT AT 1ST STY. | Sep 15, 2008 |
| Jun 12, 2008 | A | D26-31.09 ADM CODE PROVIDE AT LEAST ONE WATER CLOSET ON THE SAME FLOOR FOR THE ROOMS USED FOR CLASS B OCCUPANCY. WORK MUST BE COMPLETED UNDER PERMIT AT 2ND STY. | Sep 15, 2008 |
| Jun 12, 2008 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION 2ND STY REAR ROOM COMPLETE BATHROOM INSTALLED. | Sep 15, 2008 |
| Jun 12, 2008 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION 3RD STY REAR WEST ROOM COMPLETE BATHROOM INSTALLED. | Sep 15, 2008 |
| Jun 12, 2008 | B | § 65 M/D LAW PROVIDE UNDER COMPLETED PERMIT, A PROPER ENCLOSURE FOR THE CENTRAL HEATING PLANT, AT CELLAR. | Jul 17, 2008 |
| Jun 12, 2008 | B | § 242 M/D LAW PROVIDE UNDER COMPLETED PERMIT,A PROPER ENCLOSURE WITH FIREPROOF SELFCLOSING DOORS AND ASSEMBLIES,AT THE TOP AND THE BOTTOM OF THE CELLAR STAIRS, AT DOOR AT BOTTOM OF STAIRWAY CELLAR. | Jul 17, 2008 |
| Jun 12, 2008 | A | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING CELLAR. | Sep 15, 2008 |
| Aug 28, 2006 | B | Apt 4 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY | Oct 7, 2006 |
| Apr 7, 2000 | B | Apt 4 · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE AND ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY | May 17, 2000 |
| Oct 12, 1993 | C | Apt 5ER1 · § 231 M/D LAW PROVIDE LEGAL SECOND MEANS OF EGRESS AND FILE APPLICATION FOR APPROVAL BEFORE DOING THE WORK 3 STY SOUTH APT 5ER1 , SECTION '' '' | Nov 1, 1993 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 8:38 AM ET. BBL 1019040122.