Queens · Block 12022 · Lot 27 · 11434

117-26 Sutphin Boulevard

2 floors · 2 apartments · 2,160 sq ft · built 1930 · class S2 · owner of record: Yassin Mohamed

9open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
425dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 304 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 425 days
Next cycle year 2027

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Aug 10, 2015Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: IN CELLAR,WOOD GIRDER W/LOLLY COLUMN SUPPORTS HAS AT SPLICE SPLIT OPEN & IS SEPARATING ALSO GIRDER AT REAWR POCKET HAS ROTTED,& IS NOT FIRMLY IN POCKET.
#35137011K
Nov 17, 2015
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Oct 22, 2015CONSTRUCTION
FM. EXISTING LAYOUT OF WOOD BEAMS AND LALLY COLUMNS LOCATED IN CELLAR/ MIDSPAN/UNDERSIDE OF 1ST FLOOR IS INADAQUATE TO SUPPORT LOADS OF UPPER FLOORS.. REMEDY: REQUIRE ENGR'S REPORT WITH RECOMMENDATIONS AND CARRY OUT REPAIRS UNDER PERMIT IF NECESSARY TO START NO LATER THAN DEC 15, 2015
#FEU41201DR
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (7) · C 6 · B 0 · A 1
IssuedClassViolationCorrect by
Jun 6, 2007CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES 2ND STORY REAR APARTMENT # 2Jun 25, 2007
Jun 6, 2007CSECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES KITCHEN AND BATHROOM OF 2ND STORY REAR APARTMENT # 2 ER-1Jun 25, 2007
Jun 6, 2007CSECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES KITCHEN AND BATHROOM OF 2ND STORY REAR APARTMENT # 2, ER- 1.Jun 25, 2007
Jun 6, 2007CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM AND KITCHEN FIXTURES, 2 STORY APARTMENT #2R ER-1, #96014201.Jun 25, 2007
Jun 6, 2007CSECTION 27-2010,2011,2012 ADMIN. CODE: CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE WATER AND SEWAGE CELLAR THROUGHOUT.Jun 25, 2007
Jun 6, 2007CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM AND KITCHEN FIXTURES 2ND STORY APARTMENT # 2R, #413700.Jun 25, 2007
Jun 6, 2007ASECTION 27-2049 ADM CODE - POST AND MAINTAIN A STREET NUMBER ON THE FRONT OF THE DWELLING PLAINLY VISIBLE FROM THE SIDEWALK AT FRONT AREAWAYSep 22, 2007

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 9:25 AM ET. BBL 4120220027.

Look up another building