class V0 · owner of record: Shf Melrose Housing Development Fund Cor Poration
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 5, 2026 | Construction CLASS - 1 9 STORY NB ACTIVE SITE, OBSERVED NO/MISSING OR INADEQUATE GUARDRAILS ON MULTIPLE LEADING EDGES/UNENCLOSED PERIMETERS ON BALCONIES/TERRACES/INTERIOR SHAFTS 7,8,9 FLOORS.MAKESHIFT GUARDRAILS ON STAIR CASE OPENING #39561606H | Jan 15, 2027 PENDING | $5,000 |
| Nov 5, 2026 | Construction CLASS - 2 9 STORY NB ACTIVE SITE AT SUPERSTRUCTURE PHASE WORK ONGOING WITH CRANE/STREET OPERATIONS AT EXP#1. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS. PLANS SHOW FULL BARRICADE'S AROUND LIFTING OPERATIONS CONTROL ACCE #39561603M | Jan 15, 2027 PENDING | $1,250 |
| Oct 1, 2026 | Construction CLASS - 2 OBSERVED SUPPORTED SCAFFOLDING INSTALLED AT EXPOSURE 3 OF JOBSITE AT APPROXIMATELY 60FT. AT CELLAR THERE ARE SADDLES INSTALLED ON FRAMES WITH I-BEAM CONNECTIONS RESTED ON CONCRETE SHEER WALL. UPON REVIEW OF DOB #39560025P | Dec 18, 2026 PENDING | $1,250 |
| Sep 27, 2026 | Unknown CLASS - 2 DURING THE INSPECTION OF THE 9-STORY BUILDING UNDER CONSTRUCTION, OBSERVED INADEQUATE GUARDRAILS ON MULTIPLE FLOORS EXP1, INCLUDING MISSING GUARDRAILS/NETTINGS AND LOOSE NETTINGS. CONDITION EXPOSES WORKERS AND #39559823L | Dec 4, 2026 PENDING | $2,500 |
| Jul 6, 2026 | Construction CLASS - 2 OBSERVED PLASTIC BARRIERS INSTALLED ON THE ROADWAY NOT IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. THE BARRIERS WERE NOT INTERLOCKING AND NOT FILLED WITH WATER OR SAND, AND COULD BE EASILY DISPLACED DURING #39556236N | Mar 19, 2027 | $1,250 |
| May 4, 2026 | Construction CLASS - 2 9 STORY NB ACTIVE SITE AT SOE/FOUNDATION PHASE.OBSERVED AT EXP#4 STAY-IN-PLACE FOAM FORMWORK ON EXTERIOR FOUNDATION WALL. UPON REQUEST, SEPARATE STAY FOAM FORMWORK DESIGN DRAWINGS/INSTALL MANUFACTURER SPECIFICA #39553781P | Dec 4, 2026 | $1,250 |
| May 4, 2026 | Construction CLASS - 2 9 STORY NB AT SOE/FOUNDATION PHASE ACTIVE SITE. WORK CONTRARY TO APPROVED PLANS AT EXP#1.OBSERVED GUARDRAILS ATTACHED TO EXCAVATION ON TIMBER LAGGING. NOT ON SOE PLANS NO DETAILS FOR GUARDRAIL CONNECTIONS ON AP #39553779X | Dec 4, 2026 | $1,250 |
| May 4, 2026 | Site Safety CLASS - 1 9 STORY NB AT SOE/FOUNDATION PHASE ACTIVE SITE. OBSERVED 1 STORY BUILDING CORNER AT EXP#3 AT 3468 PARK AVENUE, 2 STORY 447 EAST 167 STREET, WITHIN 5 FEET OF FOUNDATION WALL/EXCAVATED AREA. REQUEST FOR PRE CONST #39553780N | Dec 4, 2026 | $2,500 |
| May 4, 2026 | Construction CLASS - 1 PROPOSED 9 STORY NB AT SOE/FOUNDATION PHASE. OBSERVED MISSING GUARDRAILS AT SIDES OF EXCAVATION. ROCK PILE APPROXIMATELY 6-7 FT WITHOUT FALL PROTECTION/GUARDRAILS. WORKER'S IN AREA WITHOUT PROPER SLOPING/BENCHI #39553782R | Dec 4, 2026 | $5,000 |
| May 30, 2017 | Construction CLASS - 2 ILLEGAL USE IN A RESIDENTAL DISTRICT.AT TIME OF INSPECTION I OBSERVED 8 VEHICLES PARKED IN A GATED LOT.1 DISTRICT IS NOTED R71 GENERAL RESIDENCE.REM:DISCONTINUE ILLEGAL USE. #35252326Z | Jul 21, 2017 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 9, 2007 | IMMEDIATE EMERGENCY #021/07 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| May 22, 2013 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Nov 5, 2026 | ECB | Construction: 9 STORY NB ACTIVE SITE, OBSERVED NO/MISSING OR INADEQUATE GUARDRAILS ON MULTIPLE LEADING EDGES/UNENCLOSED PERIMETERS ON BALCONIES/TERRACES/INTERIOR SHAFTS 7,8,9 FLOORS.MAKESHIFT GUARDRAILS ON STAIR CASE OPENING | Open |
| Nov 5, 2026 | ECB | Construction: 9 STORY NB ACTIVE SITE AT SUPERSTRUCTURE PHASE WORK ONGOING WITH CRANE/STREET OPERATIONS AT EXP#1. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS. PLANS SHOW FULL BARRICADE'S AROUND LIFTING OPERATIONS CONTROL ACCE | Open |
| Oct 1, 2026 | ECB | Construction: OBSERVED SUPPORTED SCAFFOLDING INSTALLED AT EXPOSURE 3 OF JOBSITE AT APPROXIMATELY 60FT. AT CELLAR THERE ARE SADDLES INSTALLED ON FRAMES WITH I-BEAM CONNECTIONS RESTED ON CONCRETE SHEER WALL. UPON REVIEW OF DOB | Open |
| Sep 27, 2026 | ECB | Unknown: DURING THE INSPECTION OF THE 9-STORY BUILDING UNDER CONSTRUCTION, OBSERVED INADEQUATE GUARDRAILS ON MULTIPLE FLOORS EXP1, INCLUDING MISSING GUARDRAILS/NETTINGS AND LOOSE NETTINGS. CONDITION EXPOSES WORKERS AND | Open |
| Jul 29, 2026 | ECB | Unknown: RESPONDING TO A WORKER INJURY DURING A FORKLIFT MATERIAL DELIVERY AT EXP#1 ROADWAY. THE SUBCONTRACTOR PRE-SHIFT MEETING FAILED TO ADDRESS THE DELIVERY SEQUENCE, FORKLIFT TRAVEL ROUTE, DESIGNATED OFF LOADING ARE | Closed |
| Jul 27, 2026 | ECB | Construction: OBSERVED MOBILE CRANE IN USE ON JOBSITE AT STREET LEVEL WITH FULL CLOSURE. UPON REVIEW OF APPROVED SITE SAFETY PLAN IT DID NOT SHOW PLACEMENT OR ANY INDICATION OF USE OF MOBILE CRANE DURING CURRENT PHASE OF OPE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:01 PM ET. BBL 2023890047.