Bronx · Block 2389 · Lot 47 · 10456

1169 Washington Avenue

class V0 · owner of record: Shf Melrose Housing Development Fund Cor Poration

7open violations
$21,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
—no dated deadlines found

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

We couldn't find building attributes for this lot, so no deadlines are listed.

Open violations

ECB / OATH (10) · $21,250 owed
IssuedViolationHearingBalance
Nov 5, 2026Construction CLASS - 1
9 STORY NB ACTIVE SITE, OBSERVED NO/MISSING OR INADEQUATE GUARDRAILS ON MULTIPLE LEADING EDGES/UNENCLOSED PERIMETERS ON BALCONIES/TERRACES/INTERIOR SHAFTS 7,8,9 FLOORS.MAKESHIFT GUARDRAILS ON STAIR CASE OPENING
#39561606H
Jan 15, 2027
PENDING
$5,000
Nov 5, 2026Construction CLASS - 2
9 STORY NB ACTIVE SITE AT SUPERSTRUCTURE PHASE WORK ONGOING WITH CRANE/STREET OPERATIONS AT EXP#1. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS. PLANS SHOW FULL BARRICADE'S AROUND LIFTING OPERATIONS CONTROL ACCE
#39561603M
Jan 15, 2027
PENDING
$1,250
Oct 1, 2026Construction CLASS - 2
OBSERVED SUPPORTED SCAFFOLDING INSTALLED AT EXPOSURE 3 OF JOBSITE AT APPROXIMATELY 60FT. AT CELLAR THERE ARE SADDLES INSTALLED ON FRAMES WITH I-BEAM CONNECTIONS RESTED ON CONCRETE SHEER WALL. UPON REVIEW OF DOB
#39560025P
Dec 18, 2026
PENDING
$1,250
Sep 27, 2026Unknown CLASS - 2
DURING THE INSPECTION OF THE 9-STORY BUILDING UNDER CONSTRUCTION, OBSERVED INADEQUATE GUARDRAILS ON MULTIPLE FLOORS EXP1, INCLUDING MISSING GUARDRAILS/NETTINGS AND LOOSE NETTINGS. CONDITION EXPOSES WORKERS AND
#39559823L
Dec 4, 2026
PENDING
$2,500
Jul 6, 2026Construction CLASS - 2
OBSERVED PLASTIC BARRIERS INSTALLED ON THE ROADWAY NOT IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. THE BARRIERS WERE NOT INTERLOCKING AND NOT FILLED WITH WATER OR SAND, AND COULD BE EASILY DISPLACED DURING
#39556236N
Mar 19, 2027
$1,250
May 4, 2026Construction CLASS - 2
9 STORY NB ACTIVE SITE AT SOE/FOUNDATION PHASE.OBSERVED AT EXP#4 STAY-IN-PLACE FOAM FORMWORK ON EXTERIOR FOUNDATION WALL. UPON REQUEST, SEPARATE STAY FOAM FORMWORK DESIGN DRAWINGS/INSTALL MANUFACTURER SPECIFICA
#39553781P
Dec 4, 2026
$1,250
May 4, 2026Construction CLASS - 2
9 STORY NB AT SOE/FOUNDATION PHASE ACTIVE SITE. WORK CONTRARY TO APPROVED PLANS AT EXP#1.OBSERVED GUARDRAILS ATTACHED TO EXCAVATION ON TIMBER LAGGING. NOT ON SOE PLANS NO DETAILS FOR GUARDRAIL CONNECTIONS ON AP
#39553779X
Dec 4, 2026
$1,250
May 4, 2026Site Safety CLASS - 1
9 STORY NB AT SOE/FOUNDATION PHASE ACTIVE SITE. OBSERVED 1 STORY BUILDING CORNER AT EXP#3 AT 3468 PARK AVENUE, 2 STORY 447 EAST 167 STREET, WITHIN 5 FEET OF FOUNDATION WALL/EXCAVATED AREA. REQUEST FOR PRE CONST
#39553780N
Dec 4, 2026
$2,500
May 4, 2026Construction CLASS - 1
PROPOSED 9 STORY NB AT SOE/FOUNDATION PHASE. OBSERVED MISSING GUARDRAILS AT SIDES OF EXCAVATION. ROCK PILE APPROXIMATELY 6-7 FT WITHOUT FALL PROTECTION/GUARDRAILS. WORKER'S IN AREA WITHOUT PROPER SLOPING/BENCHI
#39553782R
Dec 4, 2026
$5,000
May 30, 2017Construction CLASS - 2
ILLEGAL USE IN A RESIDENTAL DISTRICT.AT TIME OF INSPECTION I OBSERVED 8 VEHICLES PARKED IN A GATED LOT.1 DISTRICT IS NOTED R71 GENERAL RESIDENCE.REM:DISCONTINUE ILLEGAL USE.
#35252326Z
Jul 21, 2017
WRITTEN OFF
$0
DOB (1)
IssuedViolationStatus
Feb 9, 2007IMMEDIATE EMERGENCY

#021/07
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
May 22, 2013AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Nov 5, 2026ECBConstruction: 9 STORY NB ACTIVE SITE, OBSERVED NO/MISSING OR INADEQUATE GUARDRAILS ON MULTIPLE LEADING EDGES/UNENCLOSED PERIMETERS ON BALCONIES/TERRACES/INTERIOR SHAFTS 7,8,9 FLOORS.MAKESHIFT GUARDRAILS ON STAIR CASE OPENINGOpen
Nov 5, 2026ECBConstruction: 9 STORY NB ACTIVE SITE AT SUPERSTRUCTURE PHASE WORK ONGOING WITH CRANE/STREET OPERATIONS AT EXP#1. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS. PLANS SHOW FULL BARRICADE'S AROUND LIFTING OPERATIONS CONTROL ACCEOpen
Oct 1, 2026ECBConstruction: OBSERVED SUPPORTED SCAFFOLDING INSTALLED AT EXPOSURE 3 OF JOBSITE AT APPROXIMATELY 60FT. AT CELLAR THERE ARE SADDLES INSTALLED ON FRAMES WITH I-BEAM CONNECTIONS RESTED ON CONCRETE SHEER WALL. UPON REVIEW OF DOBOpen
Sep 27, 2026ECBUnknown: DURING THE INSPECTION OF THE 9-STORY BUILDING UNDER CONSTRUCTION, OBSERVED INADEQUATE GUARDRAILS ON MULTIPLE FLOORS EXP1, INCLUDING MISSING GUARDRAILS/NETTINGS AND LOOSE NETTINGS. CONDITION EXPOSES WORKERS ANDOpen
Jul 29, 2026ECBUnknown: RESPONDING TO A WORKER INJURY DURING A FORKLIFT MATERIAL DELIVERY AT EXP#1 ROADWAY. THE SUBCONTRACTOR PRE-SHIFT MEETING FAILED TO ADDRESS THE DELIVERY SEQUENCE, FORKLIFT TRAVEL ROUTE, DESIGNATED OFF LOADING AREClosed
Jul 27, 2026ECBConstruction: OBSERVED MOBILE CRANE IN USE ON JOBSITE AT STREET LEVEL WITH FULL CLOSURE. UPON REVIEW OF APPROVED SITE SAFETY PLAN IT DID NOT SHOW PLACEMENT OR ANY INDICATION OF USE OF MOBILE CRANE DURING CURRENT PHASE OF OPEClosed