3 floors · 4 apartments · 5,625 sq ft · built 1931 · class S4 · owner of record: 1169 Bay Street Properties, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 13, 2017 | Boilers CLASS - 2 B254,24B,34B,38,19B,34A,36. 36-WEIL MCLAIN BOILER IS NOT REGISTERED. REGISTER THE BOILER AND SUBMIT CERTIFICATE OF CORRECTION. CORRECT ALL VIOLATING CONDITIONS LISTED. #32086069R | Jun 1, 2017 ADMIT/IN-VIO | $0 |
| Dec 27, 1994 | Boilers Non-Hazardous 36. #32013007Y | Mar 15, 1995 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #16254 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #17471 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #21018 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #17237 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #22948 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #26197 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #26184 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #32387 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 5, 2016 | B | § 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 2nd STORY, SECTION ''BLDG#82'' | Mar 11, 2016 |
| Feb 5, 2016 | C | Apt 3R · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, APARTMENT AT EAST , SECTION ''BLDG#82'' | Feb 13, 2016 |
| Feb 5, 2016 | B | Apt 3R · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, APARTMENT AT EAST , SECTION ''BLDG#82'' | Mar 11, 2016 |
| Feb 5, 2016 | C | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 3rd STORY, SECTION ''BLDG#82'' | Feb 13, 2016 |
| Feb 5, 2016 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AT PUBLIC HALL, 3rd STORY, SECTION ''BLDG#82'' | Mar 11, 2016 |
| Feb 5, 2016 | A | Apt 3R · § 27-2041 ADMIN. CODE: PROVIDE A PEEP HOLE IN ENTRANCE DOOR OF THE DWELLING UNIT SO LOCATED AS TO PERMIT A PERSON INSIDE THE DWELLING UNIT TO VIEW ANY PERSON OUTSIDE ENTRANCE DOOR .... LOCATED AT APT 3R, 3rd STORY, APARTMENT AT EAST , SECTION ''BLDG#82'' | May 10, 2016 |
| Feb 5, 2016 | B | Apt 3R · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE LOWER EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, APARTMENT AT EAST , SECTION ''BLDG#82'' | Mar 11, 2016 |
| Feb 5, 2016 | B | Apt 3R · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND LOWER NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, APARTMENT AT EAST , SECTION ''BLDG#82'' | Mar 11, 2016 |
| Feb 5, 2016 | B | Apt 3R · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF RAIN WATER PENETRATING THE LOWER NORTH WALL UNDER WINDOW SILL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, APARTMENT AT EAST , SECTION ''BLDG#82'' | Mar 11, 2016 |
| Feb 5, 2016 | B | Apt 3R · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF RAIN WATER PENETRATING THE LOWER EAST WALL UNDER WINDOW SILL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, APARTMENT AT EAST , SECTION ''BLDG#82'' | Mar 11, 2016 |
| Feb 5, 2016 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WEST WALL AT PUBLIC HALL, 1st STORY, SECTION ''BLDG#82'' | Mar 11, 2016 |
| Jan 19, 2016 | A | Apt 3R · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 3R, 3rd STORY | Apr 23, 2016 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 9:53 PM ET. BBL 5028290013.