8 floors · 27,975 sq ft · built 2017 · class H3 · owner of record: Wheeler Hotel Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 59 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 111 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 27,975 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 180 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 180 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 26, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OBSERVED PAINTED SPRINKLER HEADS AND COMPONENTS OF THE SPRINKLER HEADS CONTRARY TO . BC 903.3.3 - AUTOMATIC SPRINKLERS SHALL BE INSTALLED WITH DUE REGARD TO OBSTRUCTIONS THAT COULD DEL #39201913Z | Jan 8, 2027 PENDING | $2,500 |
| Aug 26, 2026 | Construction CLASS - 1 ATOI OBSERVED ELECTRIC HOT WATER HEATER BEING IN A STORAGE ROOM WITH NO FLOOR DRAIN AND A RUBBER TUBING FOR THE PRESSURE RELIEF DRAINING INTO A GARBAGE PALE WHICH MUST BE CORRECTED BY LICENSED MASTER PLUMBER CO #39201911P | Jan 8, 2027 PENDING | $2,500 |
| Aug 21, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. AT TIME OF INSPECTION NOTICE HOLES IN MECHANICAL RM, LOBBY ENTRANCE AND THROUGH O #39157937H | Apr 20, 2027 | $2,530 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 26, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED PLASTIC PVC PIPING AND FITTINGS BEING USED FOR DRAINAGE ON THE KITCHEN SINK AND THE LAUNDRY SLOP SINK CONTRARY TO . PC 1101.10 - PVC PIPING USED FOR WASTE PIPING WAS OBSERVED | Closed |
| Aug 26, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED PAINTED SPRINKLER HEADS AND COMPONENTS OF THE SPRINKLER HEADS CONTRARY TO . BC 903.3.3 - AUTOMATIC SPRINKLERS SHALL BE INSTALLED WITH DUE REGARD TO OBSTRUCTIONS THAT COULD DEL | Open |
| Aug 26, 2026 | ECB | Construction: ATOI OBSERVED ELECTRIC HOT WATER HEATER BEING IN A STORAGE ROOM WITH NO FLOOR DRAIN AND A RUBBER TUBING FOR THE PRESSURE RELIEF DRAINING INTO A GARBAGE PALE WHICH MUST BE CORRECTED BY LICENSED MASTER PLUMBER CO | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)