13 floors · 214,370 sq ft · built 1972 · class I6 · owner of record: 1160 Teller Snf Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 67 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 214,370 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2430). Agency page | Dec 31, 2030 in 1528 days | Next due 2030 |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $313,250 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2025-10-30) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 10, 2025 | Elevators CLASS - 1 CEASE USE ITEM: DOOR ZONE RESTRICTOR INOPERATIVE. THIS IS A SAFETY FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY: TO RESTORE SERVICE, EMAIL THE D.O.B. EIR@BUILDINGS.NYC.GOV. ELEVATOR DIVISION AT FOR A REINSPEC #39150621J | Oct 20, 2026 | $1,250 |
| May 12, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTED:AT ROOF LEVEL OBSERVED DAMAGED GUARDRAILS THAT SERVES AS PARAPET AT ALL EXPOSURE. REMEDY: MAINTAIN EXTERIOR FACADE. TAKE SAFETY MEASURES AND #35693633M | Jan 9, 2026 IN VIOLATION | $5,000 |
| Jun 1, 2021 | Plumbing CLASS - 2 CONDENSATION DRAINAGE MISSING NEUTRALIZER AS WELL AS CHIMNEY FGC 503.9 CAT.IV APPLIANCE DISCHARGE PIPING ON RELIEF VALVE CONTRARY TO CODE/NO THREAD ALLOWED AS PER CODE PC 504.6.2 & PC 605.4; MC MISC, COMPLY WIT #39042209J | Sep 17, 2021 ADMIT/IN-VIO | $0 |
| Feb 8, 2019 | Construction CLASS - 2 EXPIRED PERMIT. NOTE AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED INPLACE WITH NO VALID PERMIT. EXPIRED 2-3-2019, RMDY: COMPLY WITH CODE RENEW PERMIT. #35377204J | May 10, 2019 IN VIOLATION | $625 |
| Issued | Violation | Status |
|---|---|---|
| Jun 13, 2019 | ELEVATOR #9028/629593 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 4:35 AM ET. BBL 2024300045.