2 floors · 4 apartments · 3,362 sq ft · built 1928 · class C3 · owner of record: Isaac, Jairaj
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 20, 2013 | Unknown CLASS - 2 WORK W/O A PERMIT. AT TIME OF INSPECTION OBSERVED ILLEGAL FULL HEIGHT PARTITION WALLS BEING BUILT,3PC BATHROOM WHICH INCLUDED SHOWER,TOILET & SINK,LIGHT FIXTURES WHICH HAD EXPOSED ELECTRIC & A KITCHEN W/CABINET #34957346J | Aug 16, 2013 STIPULATION/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 22, 2018 | C | Apt 2F · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 19, 2018 |
| Oct 22, 2018 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF PLASTIC EMPTY CRATES AT THE FOOT OF THE SCUTTLE LADER AT THE 2ND STORY PUBLIC HALL. | Nov 26, 2018 |
| Oct 22, 2018 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CHAINED BYCYCLE AT THE 2ND STORY WOOD RAILING. | Nov 26, 2018 |
| Oct 22, 2018 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BABY STROLLER ,RUG AND CONSTRUCTION MATERIALS AT THE 1ST STORY PUBLIC HALL | Nov 26, 2018 |
| Oct 22, 2018 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM , LOCKED DOOR AT THE 1ST STORY PUBLIC HALL LEADING TO THE BASEMENT. | Oct 30, 2018 |
| Jun 10, 2015 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICKS AND MORTAR WORKS OVER LINTELS AT 2ND STY WINDOWS PARAPET WALL | Jul 15, 2015 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 4:58 PM ET. BBL 2037400033.