Manhattan · Block 806 · Lot 52 · 10001

116 West 31 Street

18 floors · 49,286 sq ft · built 2003 · class H3 · owner of record: Hcin Herald Square Associates, Llc

7open violations
$5,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
181dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 49,286 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1156 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-15 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $416,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SWARMP (2026-02-02)

Open violations

ECB / OATH (1) · $5,000 owed
IssuedViolationHearingBalance
Oct 23, 2025Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE:-AT THE TIME OF INSPECTION OBSERVED DETERIORATED WATER TOWER AT THE ROOF. ALSO, WAS LOOSE AND MISSING WOOD MATERIAL. REMEDY: MAINTAIN EXTERIO
#35717767L
Jul 20, 2026
IN VIOLATION
$5,000
DOB (3)
IssuedViolationStatus
Oct 23, 2025CONSTRUCTION
EWO TO SEVERE DETERORATED WATER TOWER ROOF WITH LOOSE/MISSING WOOD # REMEDY: IMMEDLY PROVIDE ADEQUATE SAFETY MEASURES TO SECURE/PROTECTTHE PUBLIC/PROPERTY. IMMEDLY REMOVE ALL LOOSE MATERIAL AND STABILIZE THE WATER TOWER ROOF. ALL REMEDIAL WORK MUST BE COMPLETE UNDER F/T SUPERV OF AN RDP. PROVIDE DAI
#FA0501AB
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#01757
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#01585
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 7:18 AM ET. BBL 1008060052.

Look up another building