3 floors · 166,626 sq ft · built 1960 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3416). Agency page | Dec 31, 2026 in 70 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 166,626 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 11, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 1ST FL CAFETERIA DOOR/FRAME IN DISREPAIR DISLODGED/RACKED.REM:REPAIR AND/OR REPLACE. #35731668R | Jun 15, 2026 POP/IN-VIO | $0 |
| May 11, 2026 | Construction CLASS - 2 REISSUE ECB#35719725M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL CAFETERIA GYM,AUDITORIUM AND HALLWAYS #35731665L | Jun 15, 2026 POP/IN-VIO | $0 |
| May 11, 2026 | Construction CLASS - 2 REISSUE ECB#35717423H FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 1ST FL EXIT 3/CEILING WITH WATER DAMAGE/STAINING WITH SPALLING PLASTER/PAINT.REM:REPAIR AND/OR REPLACE. #35731667P | Jun 15, 2026 POP/IN-VIO | $0 |
| May 11, 2026 | Construction CLASS - 2 REISSUE ECB#35717424J FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT ROOF CHIMNEY WITH VERTICAL CRACKS THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR REPLACE. #35731666N | Jun 15, 2026 POP/IN-VIO | $0 |
| May 8, 2025 | Construction CLASS - 2 REISSUE #35677275L: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATIONS FOR EXITS, EXIT DISCHARGE AND PUBLIC CORRIDORS PER BC 1006.1; 270-381. EXISTING EMERGENCY LIGHTS(S) ARE NOT OPERATIONAL W #35719725M | Jun 5, 2025 POP/IN-VIO | $0 |
| May 8, 2025 | Construction CLASS - 2 REISSUE#35677278R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.1ST FLOOR NEXT TO EXIT 3 WATER INFILTRATED THROUGH CEITING AUTO WALLS CAUSE PLASTER TO SPALLING & PAINTING PEELING WITHIN ONTO RADIATOR CO #35717423H | Jul 16, 2025 POP/IN-VIO | $0 |
| May 8, 2025 | Construction CLASS - 2 REISSUE#35677277P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.OBSERVED AT ROOFTOP,CRACKS CONDITION ON CHIMNEY IN VERTICAL LINES.REM:REPAIR AND/OR REPLACE. #35717424J | Jul 16, 2025 POP/IN-VIO | $0 |
| May 21, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: AT TIME OF INSPECTION OBSERVED WATER DAMAGE TO THE CEILING PEELING PLASTER AND DAMAGEFROM FALLING WATER TO THE RADIATOR COVER AT FIRST FLOOR NEXT TO THE EX #35677278R | Sep 25, 2024 POP/IN-VIO | $0 |
| May 21, 2024 | Construction CLASS - 2 REISSUE ECB #35672711X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER: OBSERVED ILLUMINATING LIGHT IN CAFETERIA MAIN ENTRANCE DOOR NOT LIGHTING # OF EM LIGHT=4. OBSERVED ILLUMINATING LIGHTS IN GYM NOT LI #35677275L | Sep 25, 2024 POP/IN-VIO | $0 |
| May 21, 2024 | Construction CLASS - 2 REISSUE #35672710Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: AT TIME OF INSPECTION OBSERVED CRACKS IN THE MASONARY CHIMNEY ON THE ROOF CRACKS WERE FROM THE BOTTOM OF CHIMNEY TO THE TOP AT EXPO #2 #35677277P | Sep 25, 2024 POP/IN-VIO | $0 |
| Jul 13, 2023 | Construction CLASS - 2 FAILURE TO PROVIDE APPROVED/ACCEPTED CONSTRUCTION DOCUMENTS AT JOB SITE; NOTED: OBSERVED 3 WORKERS ON SITE PREFORMING WORK IN RELATION TO ACTIVE APPLICATION # B08031763 & NO APPROVED PLANS ON SITE., PROVIDE APP #39090201L | Sep 20, 2023 ADMIT/IN-VIO | $0 |
| Mar 16, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC1006.1;27-381.NOTED AT CAFETERIA MAIN ENTRANCE,EMERGENCY EXIT LIGHT#21 AND AT GYM 4 LIGHTS #35672711X | Jun 21, 2023 POP/IN-VIO | $0 |
| Mar 16, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT ROOFTOPBRICK CHIMNEY WITH STEP CRACK ON 2 SIDES GOING FROM ROOF TO THE TOP OFTHE CHIMNEY.REMEDY:MAKE NECESSARY REPAIRS. #35672710Y | Jun 21, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #11572 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #10521 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #19799 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #40218 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #21587 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #41329 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #12950 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #07818 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #09840 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21178 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21179 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21180 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 12:27 AM ET. BBL 3034160001.