8 floors · 48,911 sq ft · built 1923 · class H9 · owner of record: Hanbee Realty,
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 48,911 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $98,750 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2026-10-20) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 14, 2026 | Construction CLASS - 1 OBSERVED WORKERS WORKING ON SECOND FLOOR AGAINST STOP WORK ORDER ISSUED ON 10/09/2026 FOR DENIED ENTRY., COMPLY WITH STOP WORK ORDER #39207887L | Dec 24, 2026 PENDING | $10,000 |
| Oct 9, 2026 | Construction CLASS - 2 AT EXPOSURE 1(FRONT) 1ST FLOOR AT ENTRANCE DOOR IN CONSTRUCTION FENCE AT ACTIVE JOB#M01282645 CHAINED AND PADLOCKED DOOR OPENED A COUPLE OF INCHES OBSERVED WORKER CALLED TO WORKER TO OPEN DOOR I'M DOB INSPECTOR #39207511N | Dec 17, 2026 PENDING | $2,500 |
| Oct 9, 2026 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON SITE. AT TIME OF INSPECTION CONSTRUCTION FENCE PERMIT# M01245005-S1-FN, EXPIRED 10/31/2025., RENEW PERMIT #39207510L | Dec 17, 2026 PENDING | $1,250 |
| Oct 14, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO 39120896L., FILE A CERTIFICATE OF CORRECTION #39163512N | May 19, 2026 IN VIOLATION | $0 |
| Oct 14, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FIFE FOR VIO 39121196P., FILE A CERTIFICATE OF CORRECTION #39163520N | May 19, 2026 IN VIOLATION | $0 |
| Aug 7, 2024 | Construction CLASS - 1 OBSERVED IN THE BASEMENT/CELLAR NO FRESH AIR VENTILATION IN THE 2ND GAS METER ROOM. AS PER E 3 AND E 4 OF THE FUEL GAS CODE THE AREA IN WHICH THE METER IS LOCATED SHALL BE PROPERLY VENTILATED AS PER SECTION E.4 #39121196P | Dec 5, 2024 IN VIOLATION | $0 |
| Aug 5, 2024 | Unknown CLASS - 2 I OBSERVED ON THE ROOF SEVERAL GFCI OUTLETS DEFECTIVE AS PER EC ALL EXTERIOR OUTLETS SHALL BE GFCI PROTECTED AND WORKING/ MAINTAINED., INSTALL GFC1 PROTECTION; PROVIDE GFCI PROTECTION. #39120895J | Oct 10, 2024 IN VIOLATION | $0 |
| Aug 5, 2024 | Unknown CLASS - 1 I OBSERVED THE MEANS OF EGRESS FROM THE ELECTRICAL ROOM BLOCKED BY THE PLUMBING SYSTEM. AS PER EC 110.26-C(2)THE MEANS OF EGRESS FROM THE ELECTRICAL ROOM SHALL BE UNOBSTRUCTED.; EC 110.26-C(2), COMPLY WITH EC C #39120897N | Oct 10, 2024 IN VIOLATION | $0 |
| Aug 5, 2024 | Unknown CLASS - 1 I OBSERVED THROUGHOUT THE HALLWAYS THE FAILURE TO INSTALL TAMPER-RESISTANT/PROOF OUTLETS AS PER LL 39/ 2015 REQUIRED FOR AREAS ACCESSIBLE TO CHILDREN. PHOTOS TAKEN.; LL 39, COMPLY WITH EC CODE; PROVIDE TAMPER-R #39120893X | Oct 10, 2024 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 14, 2026 | ECB | Construction: OBSERVED WORKERS WORKING ON SECOND FLOOR AGAINST STOP WORK ORDER ISSUED ON 10/09/2026 FOR DENIED ENTRY., COMPLY WITH STOP WORK ORDER | Open |
| Oct 9, 2026 | ECB | Construction: AT EXPOSURE 1(FRONT) 1ST FLOOR AT ENTRANCE DOOR IN CONSTRUCTION FENCE AT ACTIVE JOB#M01282645 CHAINED AND PADLOCKED DOOR OPENED A COUPLE OF INCHES OBSERVED WORKER CALLED TO WORKER TO OPEN DOOR I'M DOB INSPECTOR | Open |
| Oct 9, 2026 | ECB | Construction: TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON SITE. AT TIME OF INSPECTION CONSTRUCTION FENCE PERMIT# M01245005-S1-FN, EXPIRED 10/31/2025., RENEW PERMIT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 3:44 AM ET. BBL 1002390020.