3 floors · 48,148 sq ft · built 1994 · class I5 · owner of record: Queens Village C/M/H/J/C
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-03 (Accepted). Agency page | Dec 31, 2026 in 67 days | 2 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 48,148 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 432 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 19, 2022 | Boilers CLASS - 2 REGISTER LARRS PW0715 ,715,000 BTUS BOILER FOR HOT WATER WITH H STAMP SERIAL #C04K08812 AND MISSING SPILL SWITCH, MAINTAIN BOILER; CORRECT VIOLATION AND SUBMITT CERTIFICATE OF CORRECTION #39068457Y | Mar 21, 2023 IN VIOLATION | $0 |
| Oct 16, 2018 | Boilers CLASS - 2 36. B2545-36 FOUND WEIL MCLAIN ULTRA GAS FIRED WATER BOILER NOT REGIS TERED. REGISTER THE BOILER, CORRECT ALL VIOLATING CONDITIONS AND SUB MIT A CERTIFICATE OF CORRECTION. #32097984Y | Feb 5, 2019 IN VIOLATION | $0 |
| Oct 16, 2018 | Boilers CLASS - 2 19B,34A,50A. B254-50A) NO STORAGE IN BOILER ROOM. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION. #32097983M | Feb 5, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 29, 2015 | ELEVATOR #9027/561287 | DOB VIOLATION - ACTIVE |
| Oct 28, 2013 | ELEVATOR #9027/489480 | DOB VIOLATION - ACTIVE |
| Nov 2, 2011 | ELEVATOR #9027/406274 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 7:55 AM ET. BBL 4120080007.