3 floors · 163,572 sq ft · built 1950 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 63 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-20 (Accepted). Agency page | Dec 31, 2026 in 63 days | 1 of 4 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 163,572 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2438). Agency page | Dec 31, 2028 in 794 days | Next due 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 25, 2026 | Construction CLASS - 2 RE-ISSUE #35720001P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: INTERIOR FIRE-PROOF DOORS DO NOT SELF-CLOSE PROPERLY AT, 3RD FLR-STAIRCASE "B", "G", "J". 2ND FLR-STAIRCASE "A", "B". 1ST FLR-E #35722411R | Apr 10, 2026 POP/IN-VIO | $0 |
| Mar 25, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: IN BASEMENT INSIDE GAS METER ROOM, FIRESTOPPING IS MISSING AROUND PIPES IN MULTIPLE LOCATIONS. REMEDY: PROVID #35722412Z | Apr 10, 2026 POP/IN-VIO | $0 |
| Sep 8, 2025 | Boilers CLASS - 2 FOUND FARRAR & TREFT OIL FIRED BOILER NOT OPERABLE DUE TO LEAKING TUBES AND CORRODED TUBE SHEET. REPAIR OR REPLACE BOILER. #39159582R | Oct 20, 2025 POP/IN-VIO | $0 |
| May 16, 2025 | Construction CLASS - 2 REISSUE#35684632X DATE OF ISSUE:07.17.2024 EXIT DOOR NOT SELF CLOSING PROPERLY AT THE TIME OF INSPECTION.AT THE TIME OF INSPECTION OBSERVED & NOTED AT 3RD FLOOR STAIR WAY I ONE EXIT DOOR,3RD FL STAIRWAY B 2 EXI #35720001P | Aug 15, 2025 POP/IN-VIO | $0 |
| Aug 29, 2024 | Elevators CLASS - 2 RESTORE SERVICE TO DEVICE. #39123489H | Oct 11, 2024 POP/IN-VIO | $0 |
| Jul 17, 2024 | Construction CLASS - 2 REISSUE #35663342P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY INSPECTION I OBSERVED AT THE 3RD FLOOR DOORS ARE NOT CLOSING PROPERLY DUE TO BEING IN STATE OF DISREPAIR. AT 1B MAIN ENTR #35684632X | Sep 27, 2024 POP/IN-VIO | $0 |
| Mar 15, 2023 | Construction CLASS - 2 REISSUE #35591609P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTE:OBSERVED INTERIOR DOORS LOCATED AT 3RD FL STAIR "B" "D" "G" "J" "I" CLASSROOM #302,337,338,339. 2ND FL STAIR "B", CLASSROOM #227.1ST #35663342P | Jun 30, 2023 POP/IN-VIO | $0 |
| Mar 16, 2022 | Construction CLASS - 2 RE-ISSUE #35546398L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED DOORS NOT CLOSING PROPERLY DUE TO BEING IN STATE OF DISREPAIR OR RACKED AT FOLLOWING LOCATIONS 3RD FL STAIRCASE G&J 2ND F #35591609P | Jul 1, 2022 POP/IN-VIO | $0 |
| Feb 4, 2021 | Construction CLASS - 2 REISSUE: 35490652H FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: NOTED: DOORS NOT CLOSING PROPERLY DOORS ARE IN DISREPAIR/PARKED. ROOF BULKHEAD,STAIR B,G,I&J DOUBLE DOORS NEAR RM 227 THROUGHOUT ENTIRE SCHO #35546398L | Jun 4, 2021 POP/IN-VIO | $0 |
| Sep 1, 2020 | Boilers CLASS - 2 OIL LEAKING FROM OIL PIPING AT BURNER-EXPOSED WIRING AT CONNECTION BOX NEAR INCINERATOR-NO GUARDS ON GAGE GLASS ASSEMBLY FOR CONDENSATE TANK.; CORRECT ALL VIOLATING CONDITIONS SUBMIT A CERTIFICATE OF CORRECTION #39029102N | Oct 6, 2020 POP/IN-VIO | $0 |
| Apr 1, 2015 | Elevators CLASS - 2 /97X10/ REPAIR DEVICE & RETURN TO SERVICE. #38235041J | May 15, 2015 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05708 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05705 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05706 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05707 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05493 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #43403 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #26975 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #26974 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #26973 | DOB VIOLATION - ACTIVE |
| Jul 3, 2019 | ELEVATOR #9028/655167 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 24, 2018 | B | Apt 5G · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE RETURN BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE TO APARTMENT IN THE FOYER LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 28, 2018 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 1:45 PM ET. BBL 2024380050.