Brooklyn · Block 2405 · Lot 39 · 11249

115 South 2 Street

6 floors · 30 apartments · 20,220 sq ft · built 1914 · class C1 · owner of record: 115 South 2 Llc

47open violations
$2,500ECB/OATH penalties owed
3HPD class C (immediately hazardous)
51dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 51 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 67 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 295 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 782 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $2,500 owed
IssuedViolationHearingBalance
May 5, 2023Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER I OBSERVED DOB VIOLATION NUMBER 35141706Z WAS SERVED ON 03/04/16 FOR FUTURE CONNECTION ON GAS ON LINE . I RETURNED ON 5/5/23 NO CORRECTION WAS DONE, CO
#39085630N
Nov 21, 2023
IN VIOLATION
$2,500
Mar 4, 2016Plumbing CLASS - 1
FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. AT THE TIME OF MY INSPECTION 2:30PM ON 3/4/16 AT ABOVE ADDRESS IN CELLAR I OBSERVED NEWLY INSTALLED WASTE AND SANITARY LINES AND NEWLY INSTALLED WATER HEA
#35141671H
Nov 28, 2016
IN VIOLATION
$0
Mar 4, 2016Construction CLASS - 1
WORK W/O A PERMIT. AT THE TIME OF MY INSPECTION 2:30PM ON 3/4/16 AT ABOVE ADDRESS I OBSERVED IN CELALR NEWLY INSTALLED METER BAR AND GAS PIPING WITH FITTINGS. PRIOR PERMIT #320224985-01-PL WAS FOR 20 METERS.
#35141672J
Nov 28, 2016
IN VIOLATION
$0
Mar 4, 2016Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:PROHIBITED MATERIALS AT THE TIME OF MY INSPECTION 2:30PM ON 3/4/16 AT ABOVE ADDRESS INCELLAR I OBSERVED ON FUTURE CONNECTION ON HOUSE SIDE OF GAS METER WHIC
#35141706Z
Sep 26, 2016
IN VIOLATION
$0
DOB (15)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#10730
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#09696
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#16214
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#36360
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#37639
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#17305
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#16397
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#10631
DOB VIOLATION - ACTIVE
Jun 1, 2016FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00275
DOB VIOLATION - ACTIVE
Jun 1, 2016FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00277
DOB VIOLATION - ACTIVE
Jun 1, 2016FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00276
DOB VIOLATION - ACTIVE
May 17, 2016CONSTRUCTION

#0108MH
DOB VIOLATION - ACTIVE
Oct 1, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
#09652
DOB VIOLATION - ACTIVE
Mar 3, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
#12906
DOB VIOLATION - ACTIVE
Mar 1, 2013LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
#08293
DOB VIOLATION - ACTIVE
DOB NOW Safety (15)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Jun 1, 2016AEUHAZ FTC-AEU-HAZ
Active
Jun 1, 2016AEUHAZ FTC-AEU-HAZ
Active
Jun 1, 2016AEUHAZ FTC-AEU-HAZ
Active
Oct 1, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Active
Mar 3, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Active
Mar 1, 2013Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Active
HPD (14) · C 3 · B 11 · A 0
IssuedClassViolationCorrect by
Aug 21, 2026B§ 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT BUILDING ENTRANCE , 1st STORYSep 25, 2026
Jun 12, 2026B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT BALCONY AT EAST AT FIRE ESCAPE, 4th STORYJul 17, 2026
Jun 12, 2026B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT BALCONY AT EAST AT FIRE ESCAPE, 3rd STORYJul 17, 2026
Jun 12, 2026B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS AT BALCONY AT EAST AT FIRE ESCAPE, 2nd STORYJul 17, 2026
Jun 12, 2026CApt 16 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 16, 4th STORY, 1st APARTMENT FROM NORTH AT EASTJul 8, 2026
May 1, 2026BApt 8 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 5, 2026
May 1, 2026BApt 8 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 5, 2026
May 1, 2026CApt 8 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMay 27, 2026
May 1, 2026BApt 8 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 5, 2026
May 1, 2026BApt 8 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 5, 2026
May 1, 2026BApt 8 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE LOWER WINDOW SASH AT EAST IN THE KITCHEN LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 5, 2026
Oct 30, 2024B§ 27-2005 ADM CODE PROVIDE IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY DOOR LATCH SET AT BUILDING FRONT ENTRANCE DOOR AT PUBLIC HALL, 1st STORYDec 4, 2024
Oct 30, 2024C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT FRONT ENTRANCE DOOR TO BUILDING 1ST STORY AT PUBLIC HALL, 1st STORYNov 5, 2024
Jul 8, 2013BApt 16 · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPXLY. 2 S.F. ON CASE MOULDINGS 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 16, 4th STORY, 1st APARTMENT FROM WEST AT NORTHAug 12, 2013

Issued in the last 120 days

DateSourceWhatNow
Aug 21, 2026HPD A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAClosed
Aug 21, 2026HPD B§ 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT BUILDING ENTRANCE , 1st STORYOpen
Aug 21, 2026HPD C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING ENTRANCE DOOR , 1st STORYClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 4:03 PM ET. BBL 3024050039.

Look up another building