5 floors · 44 apartments · 38,823 sq ft · built 1924 · class C1 · owner of record: 115 Mcclellan Rlty Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 38,823 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-21 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 28, 2005 | CONSTRUCTION #ER02JM | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 29, 2025 | B | Apt 51B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ.FT AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 51B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Nov 3, 2025 |
| Sep 29, 2025 | B | Apt 51B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 3rd ROOM FROM NORTH LOCATED AT APT 51B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST | Nov 3, 2025 |
| Sep 25, 2025 | C | Apt 52B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 52B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 21, 2025 |
| Nov 6, 2024 | B | Apt 42B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 42B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST | Dec 11, 2024 |
| Sep 25, 2023 | B | Apt 32B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 32B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 13, 2023 |
| Sep 25, 2023 | B | Apt 51B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 51B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 13, 2023 |
| Sep 1, 2023 | C | Apt 54A · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Sep 5, 2023 |
| Oct 19, 2022 | C | Apt 43A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 43A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' | Nov 14, 2022 |
| Oct 19, 2022 | C | Apt 43A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 43A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' | Nov 14, 2022 |
| Mar 1, 2021 | B | Apt 1B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... THE SOUTH WALL, CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 5, 2021 |
| Mar 1, 2021 | B | Apt 1B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... THE 2nd WINDOW FRAME FROM WEST AT NORTH WALL, NORTH WALL, EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 5, 2021 |
| Mar 1, 2021 | C | Apt 1B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 27, 2021 |
| Jan 15, 2021 | C | Apt 42B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 42B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST | Feb 10, 2021 |
| Jan 14, 2021 | C | Apt 42B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 42B, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST | Feb 9, 2021 |
| Jul 3, 2019 | C | Apt 44A · § 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER | Jul 31, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 11:11 AM ET. BBL 2024630026.