14 floors · 51 apartments · 51,000 sq ft · built 2005 · class D1 · owner of record: Promesa Foundation, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2826). Agency page | Dec 31, 2026 in 50 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-12-21 (Accepted). Agency page | Dec 31, 2026 in 50 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $138,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 102 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 51,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 171 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 171 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 19, 2026 | Construction CLASS - 1 OBSERVED THROUGHOUT BUILDING SPRINKLER HEADS OBSTRUCTED, CAPS MISSING FROM SPRINKLER HEADS AND PIPE PENETRATIONS WITHOUT FIRE STOP. THIRD FLOOR STAIRWAY MISSING CAP TO STANDPIPE. IN BASEMENT LEAK ON WATER PUMP #39181061M | Nov 13, 2026 ADMIT/IN-VIO | $0 |
| Mar 19, 2026 | Boilers CLASS - 3 FOUND BOILER WAS REMOVED, FAILURE TO FILE LAA FOR CAP AND REMOVAL OF BOILER. FILE LAA AND CALL FOR AN INSPECTION. #39181004X | Nov 13, 2026 ADMIT/IN-VIO | $0 |
| Mar 19, 2026 | Elevators CLASS - 2 CLASS 2: ELEVATOR MACHINE ROOM DOOR SIGN MISSING, PROVIDE. FIRE EXTINGUISHER SERVICE TAG EXPIRED, REPLACE. PIT LIGHT INOPERATIVE, REPAIR. #39181062Y | Nov 13, 2026 ADMIT/IN-VIO | $0 |
| Nov 26, 2024 | Construction CLASS - 2 OBSERVED OBSTRUCTED SPRINKLE HEAD IN THE REFUSE ROOM LOCATED ON THE 7TH FLOOR. AS PER 102.3 OF THE PLUMBING CODE INSTALLATIONS, BOTH EXISTING AND NEW, AND PARTS THEREOF SHALL BE MAINTAINED IN PROPER OPERATING C #39131464L | Jul 15, 2025 IN VIOLATION | $0 |
| Nov 26, 2024 | Construction CLASS - 2 OBSERVED PAINTED SPRINKLER HEADS THROUGHOUT REFUSE ROOMS. AS PER 102.3 OF THE PLUMBING CODE INSTALLATIONS, BOTH EXISTING AND NEW, AND PARTS THEREOF SHALL BE MAINTAINED IN PROPER OPERATING CONDITION IN ACCORDANC #39131462H | Jul 15, 2025 IN VIOLATION | $0 |
| Aug 17, 2023 | Construction CLASS - 2 OBSERVED IN THE REFUSE ROOM LOCATED ON THE 7TH FLOOR SPRINKLER HEAD IS BEING OBSTRUCTED BY THE DATA BOX. AS PER 102.3 MAINTENANCE. INSTALLATIONS, BOTH EXISTING AND NEW, AND PARTS THEREOF SHALL BE MAINTAINED IN #39092802X | Jan 26, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06129 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 28, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 20, 2024 | B | § 27-2005 ADM CODE PROVIDE IN THE EVENT OF POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT BUILDING STREET ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Mar 26, 2024 |
| Feb 20, 2024 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING STREET ENTRANCE DOOR. AT PUBLIC HALL, 1st STORY | Feb 26, 2024 |
| Aug 4, 2021 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 30, 2021 |
| Aug 4, 2021 | C | Apt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 30, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 28, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 7:38 AM ET. BBL 2028260034.