14 floors · 58,298 sq ft · built 1930 · class O7 · owner of record: Vatakis, Nick

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 44 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Energy audit and retro-commissioning (2026) Likely applies
Local Law 87 · Calendar year 2026
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1396). Agency page

Dec 31, 2026
in 44 days
Due this year
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $170,700 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 96 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 58,298 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-11 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Dec 2, 2022Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #905012.REMEDY:SUBMIT ACCEPTABLE REQUIRED TE
#37024143Y
Feb 23, 2023
IN VIOLATION
$0
DOB (3)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00466
DOB VIOLATION - ACTIVE
Nov 30, 2007LOCAL LAW 11/98 - FACADE

#NRF43508
DOB VIOLATION - ACTIVE
Aug 8, 2002LOCAL LAW 11/98 - FACADE

#NRF51265
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Nov 30, 2007Facades LL1198
CYCLE 6 NO REPORT FILED
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 2:50 AM ET. BBL 1013960007.