Bronx · Block 3262 · Lot 77 · 10463

114 West 238 Street

6 floors · 139 apartments · 115,428 sq ft · built 1928 · class D1 · owner of record: North Bronx Partners Llc

45open violations
$2,500ECB/OATH penalties owed
30HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 115,428 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2032) Likely applies
Local Law 87 · Calendar year 2032
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3262). Agency page

Dec 31, 2032
in 2239 days
Next due 2032
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-04 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
Sep 18, 2026Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION OBSERVED (1)MISSING CAMEL COPINGS PART OF THE PARAPET WALL AT ROOF LEVEL(EXP #2 SOUTH ELEV). REMEDY: MAINTAIN EXTE
#35730107M
Dec 4, 2026
PENDING
$2,500
DOB (4)
IssuedViolationStatus
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00559
DOB VIOLATION - ACTIVE
Dec 31, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
#01009
DOB VIOLATION - ACTIVE
Nov 30, 2007LOCAL LAW 11/98 - FACADE

#NRF44943
DOB VIOLATION - ACTIVE
Aug 8, 2002LOCAL LAW 11/98 - FACADE

#NRF52340
DOB VIOLATION - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Jan 14, 2026Facades FTC-FC-UNSAFE
Unsafe report filed
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Dec 31, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
Active
Nov 30, 2007Facades LL1198
CYCLE 6 NO REPORT FILED
Active
HPD (32) · C 30 · B 2 · A 0
IssuedClassViolationCorrect by
Oct 13, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORYNov 17, 2026
Jan 30, 2025BApt 6C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT BUT LESS THAN 30 SQ.FT. AT CEILING, CEILING, SOUTH, WEST NORTH WALL IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''Mar 6, 2025
Jan 13, 2025C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM, SECTION ''SOUTHEAST''Jan 19, 2025
Apr 2, 2021CApt 2K · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHApr 6, 2021
Apr 1, 2021CApt 1I · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1I, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTApr 5, 2021
Mar 30, 2021CApt 1L · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 4th APARTMENT FROM SOUTH AT WESTApr 3, 2021
Mar 26, 2021CApt 4J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM NORTH AT EASTMar 30, 2021
Mar 26, 2021CApt 1G · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMar 30, 2021
Mar 26, 2021CApt 2C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMar 30, 2021
Mar 26, 2021CApt 3A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 30, 2021
Mar 26, 2021CApt 3K · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHMar 30, 2021
Mar 26, 2021CApt 6B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHMar 30, 2021
Mar 26, 2021CApt 6J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EASTMar 30, 2021
Mar 26, 2021CApt 3J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTMar 30, 2021
Mar 8, 2021CApt 3I · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 3I, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTHMar 12, 2021
Mar 8, 2021CApt 4F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 4th APARTMENT FROM NORTH AT EASTMar 12, 2021
Mar 8, 2021CApt 5A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 12, 2021
Mar 8, 2021C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Mar 12, 2021
Mar 8, 2021CApt 2H · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHMar 12, 2021
Mar 8, 2021CApt 4E · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 3rd APARTMENT FROM NORTH AT EASTMar 12, 2021
Mar 8, 2021CApt 2E · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 3rd APARTMENT FROM NORTH AT EASTMar 12, 2021
Mar 8, 2021CApt 2B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHMar 12, 2021
Mar 8, 2021CApt 2A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 12, 2021
Mar 8, 2021CApt 1H · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHMar 12, 2021
Feb 25, 2021C§ 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Mar 1, 2021
Sep 22, 1998CApt 1K · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT EAST WALL EAST ROOM 1ST STY NORTHWEST APT 1K MRS HANLEY PH 718 601 3524 ER1 11304. , SECTION '' ''Oct 12, 1998
Sep 22, 1998CApt 1K · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WEST WALL PRIVATE HALL 1ST STY NORTHWEST APT 1K ER1 11304. , SECTION '' ''Oct 12, 1998
Feb 17, 1998CApt 1K · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING AT 1ST STY WEST APT 1K PRIVATE HALL ER1 MS HANLEY 718 601 3524. , SECTION '' ''Mar 9, 1998
Feb 17, 1998CApt 1K · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT NORTH WALL AT 1ST STY WEST APT 1K KITCHEN ER1 98003910. , SECTION '' ''Mar 9, 1998
Feb 17, 1998CApt 1K · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT AND OR PLASTER WEST WALL AT 1ST STY WEST APT 1K WEST ROOM ER1. , SECTION '' ''Mar 9, 1998
Oct 31, 1989CApt 5J · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WEST & SOUTH WALLS BATHROOM 5 STY SOUTH APT 5J SOUTH SECTION MS KRAUSS 548 8013 ER1. , SECTION '' ''Nov 20, 1989
Oct 31, 1989CApt 5J · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT ENTRANCE DOOR EXTERIOR FACE 5 STY SOUTH APT 5J SOUTH SECTION MS KRAUSS 548 8013 ER1. , SECTION '' ''Nov 20, 1989

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORYOpen
Sep 18, 2026ECBConstruction: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION OBSERVED (1)MISSING CAMEL COPINGS PART OF THE PARAPET WALL AT ROOF LEVEL(EXP #2 SOUTH ELEV). REMEDY: MAINTAIN EXTEOpen
Jul 30, 2026DOB SafetyAEUHAZ: Closed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 6:02 AM ET. BBL 2032620077.