12 floors · 41 apartments · 49,895 sq ft · built 1985 · class RM · owner of record: Arlington Properties Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-09-30 (Accepted). Agency page | Dec 31, 2026 in 43 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 49,895 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $717,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 460 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 774 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 3, 2026 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. OBSERVED DEFECTED LOOSE SAFETY NETTING ON EXPOSURE 1 CORNER OF EXPOSURE 4. REMEDY: COMPLY TO CODE SPECIFICATION. #35726602H | Oct 2, 2026 IN VIOLATION | $2,400 |
| Jun 3, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS.NOTE:RESPONDENT FAILED TO FILE CERTIFICATE OF CORRECTION FOR PRIO SUM #35679842H & #37022932H DATED 10/19/22 #35685304L | Aug 8, 2024 DEFAULT | $6,250 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQ CYCLE8B REPORT OF CRITICAL EXAM DOC CONDITION OF EXTERIOR WALL&APPURTENANCES REQ BY 28-302.4 FOR CONTROL801146.AGG2 HIST OF NONCOMPLIANCE ON 37021649H(AGG1),37013387R,36019471K #37022932H | Feb 9, 2023 DEFAULT | $10,000 |
| Jun 1, 2021 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE8B REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY28-302.4 FOR CONTROL801146.AGG1:PRIOR NOV37013387R UNDER28-302.4 SUBMIT ACCE #37021649H | Oct 14, 2021 DEFAULT | $10,000 |
| Oct 15, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL# 801146. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT. #37013387R | May 30, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 7, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AT EXP#4 WEST ELEVATION CRACKED, DAMAGED AND/OR REPLACE DEFECTED AREAS #SR0301BS | DOB VIOLATION - ACTIVE |
| Feb 3, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED CONDITIONS AT EXPOSURE 4: SPALLED BRICKS AND DAMAGED JOINTS AT 10FL CORNER OF EXPOSURE 1. REMEDY: REPAIR AND/OR REPLACE #SR0301NS | DOB VIOLATION - ACTIVE |
| Dec 1, 2024 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2400094 | DOB VIOLATION - ACTIVE |
| Feb 13, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #911430 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01715 | DOB VIOLATION - ACTIVE |
| Jun 6, 2014 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00096 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #00336 | DOB VIOLATION - ACTIVE |
| Jun 3, 2013 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00076 | DOB VIOLATION - ACTIVE |
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00173 | DOB VIOLATION - ACTIVE |
| Jan 1, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00124 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #01354 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #01511 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #00375 | DOB VIOLATION - ACTIVE |
| Jul 19, 1996 | LANDMARK #97-0058 | DOB VIOLATION - ACTIVE |
| May 30, 1989 | LANDMARK #89-0662 | DOB VIOLATION - ACTIVE |
| Jan 11, 1988 | LANDMARK #88-0405 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2024 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Feb 13, 2024 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jun 6, 2014 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 30, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Active |
| Jun 3, 2013 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 3, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jan 1, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Mar 21, 2008 | Elevators LL1081 | Active |
| Mar 21, 2008 | Elevators LL1081 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Jan 13, 1997 | Elevators LL1081 | Active |
| Jan 13, 1997 | Elevators LL1081 | Active |
| Mar 8, 1996 | Elevators LL1081 | Active |
| Mar 8, 1996 | Elevators LL1081 | Active |
| Apr 17, 1995 | Elevators LL1081 | Active |
| Apr 17, 1995 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 14, 2020 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR south wall IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 18, 2020 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 7, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AT EXP#4 WEST ELEVATION CRACKED, DAMAGED AND/OR REPLACE DEFECTED AREAS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 5:16 PM ET. BBL 1005587501.