Manhattan · Block 558 · Lot 7501 · 10003

114 East 13 Street

12 floors · 41 apartments · 49,895 sq ft · built 1985 · class RM · owner of record: Arlington Properties Inc

45open violations
$28,650ECB/OATH penalties owed
0HPD class C (immediately hazardous)
43dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 43 days
Annual
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-09-30 (Accepted). Agency page

Dec 31, 2026
in 43 days
2 of 2 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 59 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 49,895 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 287 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $717,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 460 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 774 days
Next cycle year 2028

Open violations

ECB / OATH (5) · $28,650 owed
IssuedViolationHearingBalance
Feb 3, 2026Construction CLASS - 2
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. OBSERVED DEFECTED LOOSE SAFETY NETTING ON EXPOSURE 1 CORNER OF EXPOSURE 4. REMEDY: COMPLY TO CODE SPECIFICATION.
#35726602H
Oct 2, 2026
IN VIOLATION
$2,400
Jun 3, 2024Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS.NOTE:RESPONDENT FAILED TO FILE CERTIFICATE OF CORRECTION FOR PRIO SUM #35679842H & #37022932H DATED 10/19/22
#35685304L
Aug 8, 2024
DEFAULT
$6,250
Oct 19, 2022Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQ CYCLE8B REPORT OF CRITICAL EXAM DOC CONDITION OF EXTERIOR WALL&APPURTENANCES REQ BY 28-302.4 FOR CONTROL801146.AGG2 HIST OF NONCOMPLIANCE ON 37021649H(AGG1),37013387R,36019471K
#37022932H
Feb 9, 2023
DEFAULT
$10,000
Jun 1, 2021Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE8B REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY28-302.4 FOR CONTROL801146.AGG1:PRIOR NOV37013387R UNDER28-302.4 SUBMIT ACCE
#37021649H
Oct 14, 2021
DEFAULT
$10,000
Oct 15, 2018Local Law CLASS - 2
FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL# 801146. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT.
#37013387R
May 30, 2019
IN VIOLATION
$0
DOB (16)
IssuedViolationStatus
Nov 7, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AT EXP#4 WEST ELEVATION CRACKED, DAMAGED AND/OR REPLACE DEFECTED AREAS
#SR0301BS
DOB VIOLATION - ACTIVE
Feb 3, 2026CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED CONDITIONS AT EXPOSURE 4: SPALLED BRICKS AND DAMAGED JOINTS AT 10FL CORNER OF EXPOSURE 1. REMEDY: REPAIR AND/OR REPLACE
#SR0301NS
DOB VIOLATION - ACTIVE
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2400094
DOB VIOLATION - ACTIVE
Feb 13, 2024HAZARDOUS CONDITION (FACADE)
CYCLE 9B UNSAFE REPORT FILED
#911430
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#01715
DOB VIOLATION - ACTIVE
Jun 6, 2014FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00096
DOB VIOLATION - ACTIVE
Aug 30, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
#00336
DOB VIOLATION - ACTIVE
Jun 3, 2013FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00076
DOB VIOLATION - ACTIVE
May 3, 2012FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00173
DOB VIOLATION - ACTIVE
Jan 1, 2012FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00124
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#01354
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#01511
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#00375
DOB VIOLATION - ACTIVE
Jul 19, 1996LANDMARK

#97-0058
DOB VIOLATION - ACTIVE
May 30, 1989LANDMARK

#89-0662
DOB VIOLATION - ACTIVE
Jan 11, 1988LANDMARK

#88-0405
DOB VIOLATION - ACTIVE
DOB NOW Safety (24)
IssuedViolationStatus
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Feb 13, 2024Facades FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Sep 6, 2019Elevators ACC1
Active
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
Jan 26, 2018Elevators ACC1
Active
Jun 6, 2014Benchmarking - LL84 FTF-EN-BENCH
Active
Aug 30, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Active
Jun 3, 2013Benchmarking - LL84 FTF-EN-BENCH
Active
May 3, 2012Benchmarking - LL84 FTF-EN-BENCH
Active
Jan 1, 2012Benchmarking - LL84 FTF-EN-BENCH
Active
Mar 21, 2008Elevators LL1081
Active
Mar 21, 2008Elevators LL1081
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Jan 13, 1997Elevators LL1081
Active
Jan 13, 1997Elevators LL1081
Active
Mar 8, 1996Elevators LL1081
Active
Mar 8, 1996Elevators LL1081
Active
Apr 17, 1995Elevators LL1081
Active
Apr 17, 1995Elevators LL1081
Active
HPD (1) · C 0 · B 1 · A 0
IssuedClassViolationCorrect by
Aug 14, 2020BApt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR south wall IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHSep 18, 2020

Issued in the last 120 days

DateSourceWhatNow
Nov 7, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AT EXP#4 WEST ELEVATION CRACKED, DAMAGED AND/OR REPLACE DEFECTED AREASOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 5:16 PM ET. BBL 1005587501.

Look up another building