1 floors · 1,549 sq ft · built 2005 · class K5 · owner of record: 114 Bruckner Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 25, 2026 | Unknown CLASS - 1 OBSERVED PROPOSED 14 STORY BUILDING CONDUCTING CONCRETE OPERATIONS ON 12 FLOOR. COMPLETING 12 FLOOR CONCRETE POUR. ERECTED SUPPORTED SCAFFOLDING WAS NOT AT WORKING DECK LEVEL AROUND PERIMETER OF BUILDING AS PE #39559688H | Dec 4, 2026 PENDING | $5,000 |
| Sep 21, 2026 | Unknown CLASS - 1 OBSERVED PROPOSED 14 STORY NB. CLOSED SITE. AT TIME OF EXTERIOR INSPECTION I OBSERVED JERSEY BARRIERS NOT MAINTAINED AS PER MANUFACTURER SPECIFICATIONS. BARRIERS WERE NOT FILLED WITH REQUIRED WATER/SAND AND NO #39559558J | Dec 4, 2026 PENDING | $2,500 |
| Sep 9, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OF A 14-STORY PROPOSED NEW BUILDING ACTIVE JOBSITE I OBSERVED HOLES GREATER THAN 2 INCHES THROUGHOUT JOBSITE, CREATING A HAZARDS CONDITION FOR WORKERS AND PERSONS ACCESSING AREA FROM FALLI #39558963Z | Nov 20, 2026 PENDING | $2,500 |
| Sep 9, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF A 14-STORY PROPOSED NEW BUILDING, ACTIVE SITE I OBSERVED ON THE 1ST FLOOR THERE WAS AN MAKE SHIFT OVERHEAD PROTECTION ENTIRE THE SITE, UPON REVIEWING THE APPROVED SITE SAFETY PLAN T #39558959X | Nov 20, 2026 PENDING | $1,250 |
| Sep 9, 2026 | Unknown CLASS - 1 AT THE TIME OF INSPECTION OF A 14-STORY NEW BUILDING UNDER CONSTRUCTION, AN AIR-PRESSURIZED SYSTEM FOR THE STANDPIPE WAS OBSERVED ONSITE. A RESEARCH OF THE DEPARTMENT OF BUILDINGS RECORDS REVEALED THAT NO ELECT #39558962R | Nov 20, 2026 | $2,500 |
| Sep 9, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION OF A 14-STORY PROPOSED NEW BUILDING, I OBSERVED ENTRANCE INSIDE THE BUILDING THERE WAS A MAKE SHIFT OVERHEAD PROTECTION WITH PIPE SCAFFOLDS, WHERE THE VERTICAL POSTED SETTING ON THE BA #39558960N | Nov 20, 2026 PENDING | $2,500 |
| Sep 9, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION OF A 14-STORY PROPOSED NEW BUILDING, I OBSERVED WORKERS PERFORMING FRAMING OPERATION ON THE 10TH FLOOR DECK, MULTIPLE LOCATION THROUGHOUT THE WORKING DECK HAS UNCAPPED REBAR, CREATING #39558958Y | Nov 20, 2026 PENDING | $2,500 |
| Jun 25, 2026 | Unknown CLASS - 1 3301.13.5 ALTERNATE CONSTRUCTION SUPERINTENDENT REQUIRED. DURING MY INSPECTION OF AN ACTIVE CONSTRUCTION SITE WITH AN ONGOING SOE/FOUNDATION OPERATION IN PROGRESS. I OBSERVE, UPON REVIEWING THE LOGBOOKS, THAT T #39555872J | Mar 5, 2027 | $5,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | ECB | Unknown: OBSERVED PROPOSED 14 STORY BUILDING CONDUCTING CONCRETE OPERATIONS ON 12 FLOOR. COMPLETING 12 FLOOR CONCRETE POUR. ERECTED SUPPORTED SCAFFOLDING WAS NOT AT WORKING DECK LEVEL AROUND PERIMETER OF BUILDING AS PE | Open |
| Sep 21, 2026 | ECB | Unknown: OBSERVED PROPOSED 14 STORY NB. CLOSED SITE. AT TIME OF EXTERIOR INSPECTION I OBSERVED JERSEY BARRIERS NOT MAINTAINED AS PER MANUFACTURER SPECIFICATIONS. BARRIERS WERE NOT FILLED WITH REQUIRED WATER/SAND AND NO | Open |
| Sep 9, 2026 | ECB | Unknown: AT TIME OF INSPECTION OF A 14-STORY PROPOSED NEW BUILDING ACTIVE JOBSITE I OBSERVED HOLES GREATER THAN 2 INCHES THROUGHOUT JOBSITE, CREATING A HAZARDS CONDITION FOR WORKERS AND PERSONS ACCESSING AREA FROM FALLI | Open |
| Sep 9, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OF A 14-STORY PROPOSED NEW BUILDING, ACTIVE SITE I OBSERVED ON THE 1ST FLOOR THERE WAS AN MAKE SHIFT OVERHEAD PROTECTION ENTIRE THE SITE, UPON REVIEWING THE APPROVED SITE SAFETY PLAN T | Open |
| Sep 9, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF A 14-STORY NEW BUILDING UNDER CONSTRUCTION, AN AIR-PRESSURIZED SYSTEM FOR THE STANDPIPE WAS OBSERVED ONSITE. A RESEARCH OF THE DEPARTMENT OF BUILDINGS RECORDS REVEALED THAT NO ELECT | Closed |
| Sep 9, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF A 14-STORY PROPOSED NEW BUILDING, I OBSERVED ENTRANCE INSIDE THE BUILDING THERE WAS A MAKE SHIFT OVERHEAD PROTECTION WITH PIPE SCAFFOLDS, WHERE THE VERTICAL POSTED SETTING ON THE BA | Open |
| Sep 9, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF A 14-STORY PROPOSED NEW BUILDING, I OBSERVED WORKERS PERFORMING FRAMING OPERATION ON THE 10TH FLOOR DECK, MULTIPLE LOCATION THROUGHOUT THE WORKING DECK HAS UNCAPPED REBAR, CREATING | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 2:59 PM ET. BBL 2022770005.