Brooklyn · Block 3934 · Lot 22 · 11207

114 Arlington Avenue

2 floors · 4 apartments · 5,610 sq ft · built 2024 · class C3 · owner of record: 114 Arlington Llc

7open violations
$30,000ECB/OATH penalties owed
2HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 51 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 67 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1147 days
Next cycle year 2029

Open violations

ECB / OATH (6) · $30,000 owed
IssuedViolationHearingBalance
Oct 17, 2025Site Safety CLASS - 1
OBSERVATION: NO HANDRAILS FOR STAIRS @ BASEMENT & 2NDFLOOR, STAIRS W/O INFILLS. GUARDRAILS INADEQUATE THROUGHOUT SITE. HOUSEKEEPING INADEQUATE(DEBRI, WOOD & STONE PIECES) MEANS &METHOD OF FALL PROTECTION &CMU N
#39546104M
May 21, 2027
$10,000
Oct 16, 2025Construction CLASS - 1
FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. OBSERVATION: NO HANDRAILS FOR STAIRS @BASEMENT AND 2ND FLOOR, STAIRS W/O IN FILLS. GUARDRAILS INADEQUATE THROUGHOUT SITE. HOUSEK
#39546142N
Nov 9, 2026
$10,000
Oct 16, 2025Construction CLASS - 1
OBSERVATION: COLD FORM STEEL THROUGHT SITE UPON MY REVIEW OF DRAWINGS COLD FORM MISSING LIGHT GAUGE METAL C-JOIST AND W/O BRIDGING & BRACING. PSWO FOR STRUCTURAL OPERATIONS. STOP ALL STRUCTURAL OPERATIONS UNDER
#39546091M
Jul 28, 2026
IN VIOLATION
$2,500
Oct 16, 2025Construction CLASS - 1
OBSERVATION: COLD FORM STEEL UPON MY REQUEST FOR SPECIAL INSPECTION REPORT NONE WAS PROVIDED. PSWO FOR FAILURE TO PROVIDE SPECIAL INSPECTION REPORT PURSAUNT TO CHAPTER BC 1704.1 STOP ALL WORK UNDER PERMIT #321
#39546098P
Jul 28, 2026
IN VIOLATION
$2,500
Oct 16, 2025Unknown CLASS - 2
OBSERVATION: ACTIVE JOBSITE, OPERATIONS ON SCAFFOLDS, STORAGE OF CMU BLOCKS & DEBRIS, EQUIPMENT & MATERIALS ON UNPOURED Q-DECK. NO PLANS TO VERIFY LOADS ON UNPOURED Q-DECK. PSWO FOR UNPOURED Q-DECK. PURSAUNT TO
#39546063P
Jul 28, 2026
IN VIOLATION
$2,500
Sep 20, 2025Unknown CLASS - 2
3314.01. OBSERVED SUPPORTED SCAFFOLD AT ALL EXPOSURE NOT ERECTED AND OR MAINTAINED AS PER CODE REQUIREMENTS. SCAFFOLD NOT PLATFORM FULLY PLANKED WITH LOSE PLANKS (NOT TIEDOWN), NO DEBRIS NETTING STOP ALL USE O
#39545133R
Nov 26, 2025
IN VIOLATION
$2,500
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
HPD (6) · C 2 · B 4 · A 0
IssuedClassViolationCorrect by
Dec 1, 2011CApt 2FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING , IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2FL, 2nd STORYDec 7, 2011
Dec 1, 2011BApt 2FL · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE LOCATED AT APT 2FL, 2nd STORYJan 5, 2012
Dec 1, 2011BApt 2FL · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR , IN THE KITCHEN LOCATED AT APT 2FL, 2nd STORYJan 5, 2012
Dec 1, 2011BApt 2FL · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES LOCATED AT APT 2FL, 2nd STORYJan 5, 2012
Dec 1, 2011BApt 2FL · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2FL, 2nd STORYJan 5, 2012
Dec 1, 2011CApt 2FL · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING , IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2FL, 2nd STORYDec 7, 2011

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 11:12 AM ET. BBL 3039340022.

Look up another building