Queens · Block 11134 · Lot 6 · 11411

114-57 Colfax Street

2 floors · 1 apartments · 1,548 sq ft · built 1940 · class A5 · owner of record: Baker Keretha R

14open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
295dto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 295 days
Required only if the owner doesn't live there

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jul 7, 2016Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 2ND FL OOR,FRONT BEDROOM LARGE SECTION OF CEILING APPROX.12'X6'IS SAGGING,HA S WATER STAINS AND IS IN DANGER OF FALLING,ALSO NOTED IN BACK BEDROOM
#35197253H
Aug 23, 2016
STIPULATION/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (13) · C 1 · B 9 · A 2
IssuedClassViolationCorrect by
Aug 12, 2016ISECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A V—
Aug 12, 2016BApt 2 · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 2nd STORYSep 16, 2016
Aug 12, 2016BApt 2 · SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT SKYLIGHT IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORYSep 16, 2016
Aug 12, 2016BApt 2 · SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK CEILING AND SOUTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORYSep 16, 2016
Aug 12, 2016CApt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORYAug 20, 2016
Aug 11, 2016AApt 2 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORYNov 14, 2016
Jul 14, 2016BApt 2 · SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 2nd STORYAug 18, 2016
Jul 14, 2016ASECTION 27-2023 ADMIN. CODE: PROVIDE SUFFICIENT,PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.Oct 17, 2016
Jul 14, 2016BApt 2 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... MILDEW AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORYAug 18, 2016
Jul 14, 2016BApt 2 · SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORYAug 18, 2016
Jul 14, 2016BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BRICK STOOP ENTRANCE DOOR TO BUILDING , 1st STORYAug 18, 2016
Jul 14, 2016BApt 2 · SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORYAug 18, 2016
Jul 14, 2016BSECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING ENTIRE APARTMENT , 2nd STORYAug 18, 2016

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 2:19 AM ET. BBL 4111340006.

Look up another building